1st order of business is approval of the minutes. 00:00:02
Once committee members have had a chance to review, I would entertain a motion to approve. 00:00:05
So moved, second, moved, and seconded. All in favor, say aye. 00:00:09
Minutes are approved. Item number one under New business is approval. 00:00:13
Entering their minor public works contract with L&L Crane for repair of elevator at Lift Station #45, The total repair is $27,900. 00:00:18
Kimberly welcome. 00:00:23
Hello, this is exactly what that says. It's a repair to the elevator that's inside of Lift Station 45, which is. 00:00:29
At the industrial airport industrial park area and it's with. 00:00:36
L&L Crane and Hoist Service LLC, and this is funded Out of the Fletchers. 00:00:40
Operations. Budget questions. 00:00:45
Someone second moved and seconded. All in favor, say aye. Item number one is approved, Item number two is approval. 00:00:47
To enter in the amount of public works, contract with Mark Johnson to install gas valves. 00:00:54
On on the digester. 00:00:59
Our total is eight 8940. Kimberly, sorry. 00:01:02
This is to install valves adjacent to the OR in line with the digesters at the Fletcher Water Resource Recovery Facility with Mark 00:01:06
Johnson Construction in the amount of $8940 and this is budgeted in Fletcher's outside. 00:01:13
So moved, moved, seconded. All in favor, say aye. 00:01:22
Item number 2. Spring I'm number three, approval or amount of public works contract with Rick service company for generator 00:01:26
maintenance. 00:01:29
$12,000 there. 00:01:33
Thank you, Councillor. This is for the fourth quarter. Service to the generators through Rex could be $12,000. 00:01:36
It's coming out of our outside service, routine maintenance correct questions. 00:01:43
Second, moved and seconded. All in favor, say aye, aye. Item number three is approved. Item number four is approval to enter into 00:01:50
minor public works contract. 00:01:54
With Johnny Kirksey for the Benjamin Barnes Library Roof Repair. The total is 58,985 Eric, so I'm actually drawing. 00:01:58
Our motion. 00:02:06
OK, do we have withdraw the motion to withdraw? 00:02:07
Partial title or withdraw? Withdraw OK Motion Withdraw second. 00:02:12
Yeah, All in favor. Say aye, aye. 00:02:18
Item number four is withdrawal. 00:02:20
Item number 5. 00:02:23
Approval of Municipal agency funding contract with Tuscaloosa County Parking and Transit Authority. So this is for the HVAC over 00:02:25
the IMF. 00:02:30
We're dealing in coordination with. 00:02:35
The transportation authority. 00:02:38
It's a 8020 match, we're doing the 20 side of it. 00:02:40
So they're going to purchase it and it's going to go in. 00:02:43
Basically take care of the admin offices and waiting. 00:02:46
Questions. 00:02:49
Where is funny coming from? So we've got the. 00:02:51
So the heat. 00:02:56
Rent that we collect from the key goes into an actual fund for maintenance to the IMF and it's going from there. 00:02:58
So it's. 00:03:12
Totals around. 00:03:13
40,045. 00:03:16
Motion second moved second. All in favor. Say aye, Aye. 00:03:20
Item number. 00:03:25
Set 5 as first. Sorry, item number six approval. 00:03:28
Of Emergency Minor Public Works contract with J&L Tree Service to remove Tree at 4402 17th Ave. The total is 4500. Craig, Welcome. 00:03:32
Good afternoon Council lady says this for the removal of tree at 4200 or Four O 2 17th Ave. 00:03:42
Question. 00:03:50
So moved doesn't think that will be 402, so it's kind of down by the. 00:03:51
University Club, Rockville Pass, University Club Hang a left on 17th I believe. 00:03:58
And is that next? 00:04:05
Roads to layout travelers that house on the corner right there the 17th. 00:04:07
Is that a real big tree? 00:04:12
It was a fairly big tree was damaged in the zone. 00:04:14
Wind got it. 00:04:20
Broken. 00:04:22
Questions for Craig. I think Mr. Wilson made a motion. I'll second moved, seconded all if I ever say aye, aye. 00:04:27
Item number six is Item number seven is Approval of Minor Public Works contract with Triple J to Remove three at 14 O 4 Cable Wood 00:04:34
Drive. 00:04:39
Total of $1800, correct. 00:04:43
Yes Sir. Same thing again. We're removing the tree. This one had a lot of dead wood in it, been cut on several times previous and 00:04:46
was just getting to the point where it was. 00:04:50
Outside. 00:04:55
We see these, they are on city right away. 00:04:57
Yes, Sir. 00:05:01
Alright, Motion second moved and seconded. All in favor. Say aye #7 is item number eight approval. 00:05:06
A change order number two to the construction contract with Inliner Solutions for the 2023 CMP Lining Project. Deductive total 00:05:14
19,825. Exactly. Really glad you're here. Welcome. Yeah, Like I said, this is Detective. 00:05:21
Change order 1825 dollars. 00:05:29
Projects. 00:05:35
Where's the money go to? 00:05:38
I know we're planning a phase two. 00:05:40
Pipelining, so I'm assuming it's going to get back there. 00:05:43
Motion. Second moved, seconded. All in favor? Say aye. 00:05:45
Item number 8 is for. 00:05:50
Approval item number 9 is approval of balancing change order to the construction contract of GFC for the MLK Jack Warner Pkwy 00:05:54
improvements. 00:05:58
Phase one total is 527. 00:06:03
36608 Welcome correct Council. 00:06:05
Balance and change order of physics, construction contract, GC construction. 00:06:10
You mentioned 527, three 6608, it's about 4.9%. 00:06:15
And of that amount, there's about 238,000. 00:06:22
Which is related to. 00:06:25
Extension of the undercut areas and backfill. 00:06:27
Right. That's base and pave operations towards the Trestle and Jack Warner. 00:06:31
Additional patching and leveling between the railroad trestles. 00:06:35
And extension of Piping and Crossroad Correctional, Steelman Blvd. 00:06:39
The reminder is $288,000, which is for tree clearing to the West side of the MLK right away. 00:06:44
And the funding source is the 2028 bond tick. Greg had some questions. 00:06:52
Uh. 00:06:57
We submit it to Tikrit on 9/1. 00:06:59
And I believe the Thrones were. 00:07:02
Getting those answered, yes. So we gave we since these are tick tick Rick related projects, we gave them a heads up on the 1st 00:07:05
that these were going to be coming on to council. 00:07:10
They had some questions last week. We responded to those questions and then Miss Spruill sent me some more questions. 00:07:15
Around 11/11/30 this morning. So we're still working with them to get their questions answered before we ultimately. 00:07:21
Uh, take the reimbursement needed to to to. 00:07:27
Scratches. 00:07:31
Scott, what's the timeline of getting those questions? 00:07:33
Answer. 00:07:36
I thought we had them answered last week, so I mean they should be, they should be answered in in anticipation of the next tick 00:07:37
meeting which is the 25th or 26th. 00:07:40
Pretty good. 00:07:46
So this 4.9%. 00:07:47
Is this? 00:07:51
Still within the amount. 00:07:51
Therefore, contingency. 00:07:53
Is this money coming? 00:07:56
From someplace else. 00:07:57
Or is it in the contingency component? 00:07:59
It's coming from the 2028 Bond. 00:08:05
Yes. 00:08:08
All of our money was coming. 00:08:10
20289, right? 00:08:12
Who do you keep looking at? I'm looking at Miss Chief. 00:08:16
Yes, Sir. I believe it's coming from the 2028 Bond. 00:08:19
Should be coming up. 00:08:25
Put a 10%. 00:08:28
I'm happy to help, but you don't want me to be the source to source information. 00:08:30
So we took 10.8 million from the 2020. 00:08:36
A bond and. 00:08:40
Senator over TIFF. Rick, it says right there. 00:08:42
And. 00:08:47
Usually. 00:08:48
There's a 10% component. 00:08:50
That is contingency, right? 00:08:52
Normally with most of our projects, but with this project we've had several change orders so that. 00:08:55
Now speaking again, I'll hand. OK, so, so. 00:09:01
We're now outside. We we think we're outside. 00:09:05
The. 00:09:09
Found the band of contingency. 00:09:10
That was originally put in for this. 00:09:13
Right, Because it's what makes this project even a little more confusing as you have phase. We won't, we have to break it up in 00:09:15
parts because of the railroad issue. 00:09:19
And so you're in phase one, phase two and then hopefully we will begin phase three. 00:09:23
Early part of next year. 00:09:29
That this project. 00:09:32
It's been borrowed in different stages, so. 00:09:34
I don't know off the top of my head what the contingency amount is. I'm certain that A and F. 00:09:37
We can get that number for you. 00:09:43
Quickly following this meeting. 00:09:45
Just. 00:09:48
We're waiting on questions. 00:09:51
From. 00:09:53
The counties, well, will it, will it derail anything if we move this to next week and just get? 00:09:54
Some of these questions clarified. 00:10:00
I think the only thing that will happen, I think the only delay will happen is whoever is waiting to get paid for this will be 00:10:03
delayed the weekend and getting paid. 00:10:06
Funding sources Ticker. 00:10:15
OK. 00:10:18
I will make a motion to approve. 00:10:22
Funding source is to create. 00:10:24
Yes. 00:10:28
Alright. 00:10:32
All of our. 00:10:33
But if something happens. 00:10:37
Decline. 00:10:40
Then we've got another issue that we've got to talk about, right? 00:10:41
They they won't. I mean, we feel confident they're going to approve that, right? 00:10:46
So the the funding is is the 2020 A bond? 00:10:51
That we have a funding agreement with the TCRC to pay U.S. debt service on the 2028 bond to reimburse U.S. debt service. 00:10:55
His question when you weren't in here was is that is are they? 00:11:03
Positive changes. We're going to have more monies that come out contingency in that box. 00:11:06
So we over bonded basically for phase one and two in anticipation of phase three. 00:11:12
And so that amount is coming from the, from the additional bond capacity that we have that we will then when we do bond out for 00:11:18
the rest of phase three, we would settle up if there were any contentious items. 00:11:24
Does that answer your question? 00:11:32
I'm #10. 00:11:39
Approval of change order number one. 00:11:41
Instruction contract with GFC. 00:11:43
For the MLK Jack Warner Parkway Improvement phase two project, the total is 252,000. 00:11:45
74108 and an additional 120 days. 00:11:51
Thank you, Councillor. 00:11:56
This request includes that time extension 120 days and that. 00:11:59
Amount to 252,000 is 4.9% again. 00:12:04
Which changes the original contract amount from 4.9 to 5.201. 00:12:08
Of this amount of the 250, two 96,781. 00:12:14
Is for slotted drain pipe related to the road project. 00:12:19
And this amount will be paid. 00:12:23
From the 2028 bond to be reimbursed by, according to the city's agreement. 00:12:25
The remaining $155,959.22. 00:12:31
Is for the Newtown park, which is the city project. 00:12:36
And that amount will be paid by the city's GFR. 00:12:40
F5 General Fund. 00:12:44
And the questions from item nine with Tidrick, we're we're having that discussion with this item kind of as one big. 00:12:47
Joint thing. 00:12:53
Craig. 00:13:02
Upper Dome. 00:13:04
Many of the residents of the Newtown area have concerns about. 00:13:06
The park on the small park on one side and the big. 00:13:10
Our land on the other. 00:13:14
Is there anything that you can speak to there? 00:13:16
How, how the small apartments chosen versus the the large piece of the property? I think, I think I can what are the residents in 00:13:22
that area? Yes, on that side of the road kind of floated that idea. 00:13:27
That's how important location was decided upon. 00:13:33
And there's a there's an existing monuments on there too with the New Town. 00:13:36
Modern software detail. 00:13:42
Like the original detail. 00:13:44
So that's again that's delta. 00:13:47
Factored into the reason that's OK, so. 00:13:50
Because so are you saying one person? 00:13:52
Said it. And you have. You have other residents on the other side of the street as well as. 00:13:55
Other residents on the side of the. 00:14:01
Monument is. 00:14:03
But you took only one. 00:14:04
It wasn't brought, It was me, OK? 00:14:06
No, we met with the constituent out there and other constituents. 00:14:11
Out there as well. 00:14:16
And it was an idea driven by constituents. To my knowledge, no one ever met with me. 00:14:17
And requested a park on the other side of the street. Nor you've never met me and requested to park on the other side of the 00:14:23
street. 00:14:26
We certainly if there's. 00:14:31
Anybody wants to explore, we can certainly explore. 00:14:34
This was proposed, I want to say, as part of my 22 RFI proposal. 00:14:39
Like 300 something thousand dollar 223-270-5275 certainly open to it and it. 00:14:45
We think it could be a nice little pocket park in that area. 00:14:53
It certainly wasn't meant. 00:14:56
For somebody not to have something somewhere else. 00:14:58
And and just to just to to point out any changes this council voted on, I think all presented Tyler Bonovich presented several 00:15:02
months ago sort of the, the outline of where this park was because we had to get approval from Montgomery for for the sign. And so 00:15:08
if if anything changes we'll have to hit pause and we have to go all the way back, wait till that, wait till that Commission gave 00:15:14
us that permission. 00:15:21
To meet and approve again, there's been council authorization on several steps I know as part of this project. 00:15:27
Mr. Chairman, I will make a motion to approve this, but I I would ask for next. 00:15:37
Next week's projects. 00:15:42
But could we request? 00:15:44
Just a simple 5 minute. 00:15:46
Update and overview and because I've lost track. 00:15:48
And I have no doubt that that's the limitation on my part. 00:15:52
But. 00:15:56
Just a 5 minute. 00:15:58
Big view. Here's what we planned. Here's where we are in it. Here's how much over under, and here's what we think is still coming 00:15:59
down the road. 00:16:04
For the for the project, right, yes. 00:16:09
That's probably not a bad idea considering hopefully. 00:16:14
We will be will break loose from the railroads at some point as well. 00:16:17
So we can tear down all of the. 00:16:21
Who will? 00:16:24
Well, it would be the problem. Will you do that or who will do it? 00:16:26
Still do. 00:16:29
That that railroad will have to stay, so you'll be up there next week. 00:16:30
That's great. 00:16:34
And I'm talking about surely an informational. 00:16:37
So there's a there's a motion on the table for this item. 00:16:42
#10 We got a motion to second. All in favor, Say aye. 00:16:47
He thought he was leaving the city. Engineers, all we're driving. 00:16:53
Good morning. Trying to return, we're looking forward to that item number 11. 00:16:57
Authorization to execute a grant agreement. 00:17:04
With the FAA and and the Alabama dot. 00:17:06
The runway 422 extension environmental assessment the totals 289,336. Jeff, welcome. Good afternoon. We've talked on a couple of 00:17:10
these projects in prior meetings whether they're work authorizations or authorization to apply for the grant. We have received 00:17:16
notice for the grant award to be offered to the city. 00:17:22
The first one was offered on August 31st. 00:17:28
And we received a grant, a second grant offer on 9/6 and they notified that they'd like to have signatures by 9:15. And that's why 00:17:31
we're asking for the double up today. 00:17:36
Our service number 11 item is for the grant offer for the environmental assessment regarding the Runway 4/2 extension. 00:17:41
And that is that $289,000 is the. 00:17:50
Grant award number. 00:17:53
We budget for 10% and that is $32,148.45. 00:17:55
We're expecting the grant from the Alba side to come following this grant offer, which changed that down to 5%. 00:18:00
Someone. 00:18:08
Second move and second all in favor, say aye aye item number 11 is approved. 00:18:09
The second grant award is ready to go ahead and see where the work authority. 00:18:14
Authorization portion. 00:18:18
For 270 thousand $273,622.95. 00:18:20
And that will be concurrent with the ground award being executed as well. 00:18:25
And for the record, that is approval of work authorization for Atkins North America Design and Display Services regarding the 00:18:29
cargo. 00:18:32
And operations overflowed apron, just for the record. 00:18:37
So. 00:18:40
Second, second all in favor, Say aye, aye. 00:18:44
I'm 14. 00:18:48
Authorization Executive Grant Agreement with the FAA and AL dot for the Cargo and Operations overflow apron project. Jeff. 00:18:50
Yes, Sir. That is for the grant agreement portion for this project to coincide with the the work authorization. The grant award is 00:18:58
for $246,450. 00:19:02
The 10% match is $27,383.33. Again at the ALDOT grant offers follows our for our requirements will be 5% instead of the 10%. 00:19:06
And are these five percents, Are they in your budget somewhere? We plan for 10% when you apply for the. 00:19:18
When you applied for the grant. 00:19:26
We talked about those numbers and approved. 00:19:28
That potential match. 00:19:31
Yes, Sir. Under the 10% because we never can guarantee if Al Dot's going to be able to have the funding to persist participate in 00:19:33
5%. And this is something that I requested if I could jump in with Jeff on this items specifically in relation to that question, 00:19:38
Mr. Buzzy. 00:19:42
With the five, what we are planning for is 5%. However, at the most conservative estimate we will be budgeting for the 10% amount 00:19:48
currently. 00:19:53
If you will recall, within your elevated budget that was proposed by the mayor, there is a TCL Grant match item. 00:19:59
So that will be what's on a piece of what's on the Finance Committee for all the budget adoptions. 00:20:05
Yes Sir. So the source is going to be the TCL Grant match amount. 00:20:11
It's $1 million for fiscal 24 within the Elevate budget. 00:20:15
That's coming to you and so this afternoon obviously Jeff needs to have these doubled up on City Council for this evening and so, 00:20:19
but just be aware that if we can go ahead and add the grant. 00:20:26
Revenue items also into the Elevate budget. 00:20:35
That would help facilitate this a little bit quicker. 00:20:38
So we hear a motion. 00:20:43
Some of. 00:20:46
2nd. 00:20:54
In all the fiber say aye aye I don't #13. 00:20:56
Go ahead. 00:21:02
I remember Fort Wayne is authorization for the Chief Information Officer to execute budgeted agreements with Verizon Wireless, 00:21:03
Jason Walker. 00:21:07
Good afternoon. 00:21:11
This is similar to the other agreements that that you've authorized for Comcast and Ceasefire, which allows you to. 00:21:12
That are that are already budgeted. 00:21:23
Are they gonna dig up anything? 00:21:25
God. 00:21:30
Alright. 00:21:33
Motion seconded. All in favor? Say aye. 00:21:34
I don't know. 14 is approved. Item number 15 is approval and authorization for supplemental agreement number one to the right of 00:21:39
entry for construction for the US Army Corps of Engineer. 00:21:44
Tom. 00:21:50
Currently we have an agreement with the core of engineers regarding the construction of their new facility on. 00:21:53
Jackman Parkway. 00:21:59
And they're asking in that agreement. 00:22:01
We had a 24 month period that we granted them our right of entry to go across city property. 00:22:04
The core is asking for an additional 12 months. 00:22:09
And that for that agreement, which would extend it out to February 2026. 00:22:12
And Mr. Kevin Cauley for the course here if you have any specific questions. 00:22:17
Ohh golly, how are you? 00:22:26
What's it like? Well, what's going on is we. 00:22:30
Expect to award a contract in November. 00:22:34
Issue a notice to proceed in January. 00:22:37
And the construction time be 18 months. 00:22:41
That gets us to June of 25. 00:22:44
And our current array of entry mixed Myers in February of 25. 00:22:47
So adding another. 00:22:52
A year or two, it was a. 00:22:54
You know, get us to February 26, which should be ample time for the 18 months plus. 00:22:56
Built in the late time. 00:23:02
Tell me the impact on that. 00:23:05
No. 00:23:06
2nd is also tied into their instructions also once their construction is on. 00:23:08
Is a land swap with cord which the city would receive the land for the. 00:23:14
Smooth second all in favor. Say aye aye, Item number 15, Proof. 00:23:21
Is there any other business to be brought before our committee? 00:23:25
Our next Public Projects Committee meeting will be next Tuesday, September the 19th. I would entertain a motion to adjourn second. 00:23:29
And second, all in favor, say aye. 00:23:37

Link

Start video at

Social

Embed


* you need to log in to manage your favorites

My Favorites List
You haven't added any favorites yet. Click the "Add Favorite" button on any media page, and they'll show up here.
* use Ctrl+F (Cmd+F on Mac) to search in document
Loading...
Unable to preview the file.
* use Ctrl+F (Cmd+F on Mac) to search in document
Loading...
Unable to preview the file.
Today is Tuesday, September the 12th. 00:00:00
1st order of business is approval of the minutes. 00:00:02
Once committee members have had a chance to review, I would entertain a motion to approve. 00:00:05
So moved, second, moved, and seconded. All in favor, say aye. 00:00:09
Minutes are approved. Item number one under New business is approval. 00:00:13
Entering their minor public works contract with L&L Crane for repair of elevator at Lift Station #45, The total repair is $27,900. 00:00:18
Kimberly welcome. 00:00:23
Hello, this is exactly what that says. It's a repair to the elevator that's inside of Lift Station 45, which is. 00:00:29
At the industrial airport industrial park area and it's with. 00:00:36
L&L Crane and Hoist Service LLC, and this is funded Out of the Fletchers. 00:00:40
Operations. Budget questions. 00:00:45
Someone second moved and seconded. All in favor, say aye. Item number one is approved, Item number two is approval. 00:00:47
To enter in the amount of public works, contract with Mark Johnson to install gas valves. 00:00:54
On on the digester. 00:00:59
Our total is eight 8940. Kimberly, sorry. 00:01:02
This is to install valves adjacent to the OR in line with the digesters at the Fletcher Water Resource Recovery Facility with Mark 00:01:06
Johnson Construction in the amount of $8940 and this is budgeted in Fletcher's outside. 00:01:13
So moved, moved, seconded. All in favor, say aye. 00:01:22
Item number 2. Spring I'm number three, approval or amount of public works contract with Rick service company for generator 00:01:26
maintenance. 00:01:29
$12,000 there. 00:01:33
Thank you, Councillor. This is for the fourth quarter. Service to the generators through Rex could be $12,000. 00:01:36
It's coming out of our outside service, routine maintenance correct questions. 00:01:43
Second, moved and seconded. All in favor, say aye, aye. Item number three is approved. Item number four is approval to enter into 00:01:50
minor public works contract. 00:01:54
With Johnny Kirksey for the Benjamin Barnes Library Roof Repair. The total is 58,985 Eric, so I'm actually drawing. 00:01:58
Our motion. 00:02:06
OK, do we have withdraw the motion to withdraw? 00:02:07
Partial title or withdraw? Withdraw OK Motion Withdraw second. 00:02:12
Yeah, All in favor. Say aye, aye. 00:02:18
Item number four is withdrawal. 00:02:20
Item number 5. 00:02:23
Approval of Municipal agency funding contract with Tuscaloosa County Parking and Transit Authority. So this is for the HVAC over 00:02:25
the IMF. 00:02:30
We're dealing in coordination with. 00:02:35
The transportation authority. 00:02:38
It's a 8020 match, we're doing the 20 side of it. 00:02:40
So they're going to purchase it and it's going to go in. 00:02:43
Basically take care of the admin offices and waiting. 00:02:46
Questions. 00:02:49
Where is funny coming from? So we've got the. 00:02:51
So the heat. 00:02:56
Rent that we collect from the key goes into an actual fund for maintenance to the IMF and it's going from there. 00:02:58
So it's. 00:03:12
Totals around. 00:03:13
40,045. 00:03:16
Motion second moved second. All in favor. Say aye, Aye. 00:03:20
Item number. 00:03:25
Set 5 as first. Sorry, item number six approval. 00:03:28
Of Emergency Minor Public Works contract with J&L Tree Service to remove Tree at 4402 17th Ave. The total is 4500. Craig, Welcome. 00:03:32
Good afternoon Council lady says this for the removal of tree at 4200 or Four O 2 17th Ave. 00:03:42
Question. 00:03:50
So moved doesn't think that will be 402, so it's kind of down by the. 00:03:51
University Club, Rockville Pass, University Club Hang a left on 17th I believe. 00:03:58
And is that next? 00:04:05
Roads to layout travelers that house on the corner right there the 17th. 00:04:07
Is that a real big tree? 00:04:12
It was a fairly big tree was damaged in the zone. 00:04:14
Wind got it. 00:04:20
Broken. 00:04:22
Questions for Craig. I think Mr. Wilson made a motion. I'll second moved, seconded all if I ever say aye, aye. 00:04:27
Item number six is Item number seven is Approval of Minor Public Works contract with Triple J to Remove three at 14 O 4 Cable Wood 00:04:34
Drive. 00:04:39
Total of $1800, correct. 00:04:43
Yes Sir. Same thing again. We're removing the tree. This one had a lot of dead wood in it, been cut on several times previous and 00:04:46
was just getting to the point where it was. 00:04:50
Outside. 00:04:55
We see these, they are on city right away. 00:04:57
Yes, Sir. 00:05:01
Alright, Motion second moved and seconded. All in favor. Say aye #7 is item number eight approval. 00:05:06
A change order number two to the construction contract with Inliner Solutions for the 2023 CMP Lining Project. Deductive total 00:05:14
19,825. Exactly. Really glad you're here. Welcome. Yeah, Like I said, this is Detective. 00:05:21
Change order 1825 dollars. 00:05:29
Projects. 00:05:35
Where's the money go to? 00:05:38
I know we're planning a phase two. 00:05:40
Pipelining, so I'm assuming it's going to get back there. 00:05:43
Motion. Second moved, seconded. All in favor? Say aye. 00:05:45
Item number 8 is for. 00:05:50
Approval item number 9 is approval of balancing change order to the construction contract of GFC for the MLK Jack Warner Pkwy 00:05:54
improvements. 00:05:58
Phase one total is 527. 00:06:03
36608 Welcome correct Council. 00:06:05
Balance and change order of physics, construction contract, GC construction. 00:06:10
You mentioned 527, three 6608, it's about 4.9%. 00:06:15
And of that amount, there's about 238,000. 00:06:22
Which is related to. 00:06:25
Extension of the undercut areas and backfill. 00:06:27
Right. That's base and pave operations towards the Trestle and Jack Warner. 00:06:31
Additional patching and leveling between the railroad trestles. 00:06:35
And extension of Piping and Crossroad Correctional, Steelman Blvd. 00:06:39
The reminder is $288,000, which is for tree clearing to the West side of the MLK right away. 00:06:44
And the funding source is the 2028 bond tick. Greg had some questions. 00:06:52
Uh. 00:06:57
We submit it to Tikrit on 9/1. 00:06:59
And I believe the Thrones were. 00:07:02
Getting those answered, yes. So we gave we since these are tick tick Rick related projects, we gave them a heads up on the 1st 00:07:05
that these were going to be coming on to council. 00:07:10
They had some questions last week. We responded to those questions and then Miss Spruill sent me some more questions. 00:07:15
Around 11/11/30 this morning. So we're still working with them to get their questions answered before we ultimately. 00:07:21
Uh, take the reimbursement needed to to to. 00:07:27
Scratches. 00:07:31
Scott, what's the timeline of getting those questions? 00:07:33
Answer. 00:07:36
I thought we had them answered last week, so I mean they should be, they should be answered in in anticipation of the next tick 00:07:37
meeting which is the 25th or 26th. 00:07:40
Pretty good. 00:07:46
So this 4.9%. 00:07:47
Is this? 00:07:51
Still within the amount. 00:07:51
Therefore, contingency. 00:07:53
Is this money coming? 00:07:56
From someplace else. 00:07:57
Or is it in the contingency component? 00:07:59
It's coming from the 2028 Bond. 00:08:05
Yes. 00:08:08
All of our money was coming. 00:08:10
20289, right? 00:08:12
Who do you keep looking at? I'm looking at Miss Chief. 00:08:16
Yes, Sir. I believe it's coming from the 2028 Bond. 00:08:19
Should be coming up. 00:08:25
Put a 10%. 00:08:28
I'm happy to help, but you don't want me to be the source to source information. 00:08:30
So we took 10.8 million from the 2020. 00:08:36
A bond and. 00:08:40
Senator over TIFF. Rick, it says right there. 00:08:42
And. 00:08:47
Usually. 00:08:48
There's a 10% component. 00:08:50
That is contingency, right? 00:08:52
Normally with most of our projects, but with this project we've had several change orders so that. 00:08:55
Now speaking again, I'll hand. OK, so, so. 00:09:01
We're now outside. We we think we're outside. 00:09:05
The. 00:09:09
Found the band of contingency. 00:09:10
That was originally put in for this. 00:09:13
Right, Because it's what makes this project even a little more confusing as you have phase. We won't, we have to break it up in 00:09:15
parts because of the railroad issue. 00:09:19
And so you're in phase one, phase two and then hopefully we will begin phase three. 00:09:23
Early part of next year. 00:09:29
That this project. 00:09:32
It's been borrowed in different stages, so. 00:09:34
I don't know off the top of my head what the contingency amount is. I'm certain that A and F. 00:09:37
We can get that number for you. 00:09:43
Quickly following this meeting. 00:09:45
Just. 00:09:48
We're waiting on questions. 00:09:51
From. 00:09:53
The counties, well, will it, will it derail anything if we move this to next week and just get? 00:09:54
Some of these questions clarified. 00:10:00
I think the only thing that will happen, I think the only delay will happen is whoever is waiting to get paid for this will be 00:10:03
delayed the weekend and getting paid. 00:10:06
Funding sources Ticker. 00:10:15
OK. 00:10:18
I will make a motion to approve. 00:10:22
Funding source is to create. 00:10:24
Yes. 00:10:28
Alright. 00:10:32
All of our. 00:10:33
But if something happens. 00:10:37
Decline. 00:10:40
Then we've got another issue that we've got to talk about, right? 00:10:41
They they won't. I mean, we feel confident they're going to approve that, right? 00:10:46
So the the funding is is the 2020 A bond? 00:10:51
That we have a funding agreement with the TCRC to pay U.S. debt service on the 2028 bond to reimburse U.S. debt service. 00:10:55
His question when you weren't in here was is that is are they? 00:11:03
Positive changes. We're going to have more monies that come out contingency in that box. 00:11:06
So we over bonded basically for phase one and two in anticipation of phase three. 00:11:12
And so that amount is coming from the, from the additional bond capacity that we have that we will then when we do bond out for 00:11:18
the rest of phase three, we would settle up if there were any contentious items. 00:11:24
Does that answer your question? 00:11:32
I'm #10. 00:11:39
Approval of change order number one. 00:11:41
Instruction contract with GFC. 00:11:43
For the MLK Jack Warner Parkway Improvement phase two project, the total is 252,000. 00:11:45
74108 and an additional 120 days. 00:11:51
Thank you, Councillor. 00:11:56
This request includes that time extension 120 days and that. 00:11:59
Amount to 252,000 is 4.9% again. 00:12:04
Which changes the original contract amount from 4.9 to 5.201. 00:12:08
Of this amount of the 250, two 96,781. 00:12:14
Is for slotted drain pipe related to the road project. 00:12:19
And this amount will be paid. 00:12:23
From the 2028 bond to be reimbursed by, according to the city's agreement. 00:12:25
The remaining $155,959.22. 00:12:31
Is for the Newtown park, which is the city project. 00:12:36
And that amount will be paid by the city's GFR. 00:12:40
F5 General Fund. 00:12:44
And the questions from item nine with Tidrick, we're we're having that discussion with this item kind of as one big. 00:12:47
Joint thing. 00:12:53
Craig. 00:13:02
Upper Dome. 00:13:04
Many of the residents of the Newtown area have concerns about. 00:13:06
The park on the small park on one side and the big. 00:13:10
Our land on the other. 00:13:14
Is there anything that you can speak to there? 00:13:16
How, how the small apartments chosen versus the the large piece of the property? I think, I think I can what are the residents in 00:13:22
that area? Yes, on that side of the road kind of floated that idea. 00:13:27
That's how important location was decided upon. 00:13:33
And there's a there's an existing monuments on there too with the New Town. 00:13:36
Modern software detail. 00:13:42
Like the original detail. 00:13:44
So that's again that's delta. 00:13:47
Factored into the reason that's OK, so. 00:13:50
Because so are you saying one person? 00:13:52
Said it. And you have. You have other residents on the other side of the street as well as. 00:13:55
Other residents on the side of the. 00:14:01
Monument is. 00:14:03
But you took only one. 00:14:04
It wasn't brought, It was me, OK? 00:14:06
No, we met with the constituent out there and other constituents. 00:14:11
Out there as well. 00:14:16
And it was an idea driven by constituents. To my knowledge, no one ever met with me. 00:14:17
And requested a park on the other side of the street. Nor you've never met me and requested to park on the other side of the 00:14:23
street. 00:14:26
We certainly if there's. 00:14:31
Anybody wants to explore, we can certainly explore. 00:14:34
This was proposed, I want to say, as part of my 22 RFI proposal. 00:14:39
Like 300 something thousand dollar 223-270-5275 certainly open to it and it. 00:14:45
We think it could be a nice little pocket park in that area. 00:14:53
It certainly wasn't meant. 00:14:56
For somebody not to have something somewhere else. 00:14:58
And and just to just to to point out any changes this council voted on, I think all presented Tyler Bonovich presented several 00:15:02
months ago sort of the, the outline of where this park was because we had to get approval from Montgomery for for the sign. And so 00:15:08
if if anything changes we'll have to hit pause and we have to go all the way back, wait till that, wait till that Commission gave 00:15:14
us that permission. 00:15:21
To meet and approve again, there's been council authorization on several steps I know as part of this project. 00:15:27
Mr. Chairman, I will make a motion to approve this, but I I would ask for next. 00:15:37
Next week's projects. 00:15:42
But could we request? 00:15:44
Just a simple 5 minute. 00:15:46
Update and overview and because I've lost track. 00:15:48
And I have no doubt that that's the limitation on my part. 00:15:52
But. 00:15:56
Just a 5 minute. 00:15:58
Big view. Here's what we planned. Here's where we are in it. Here's how much over under, and here's what we think is still coming 00:15:59
down the road. 00:16:04
For the for the project, right, yes. 00:16:09
That's probably not a bad idea considering hopefully. 00:16:14
We will be will break loose from the railroads at some point as well. 00:16:17
So we can tear down all of the. 00:16:21
Who will? 00:16:24
Well, it would be the problem. Will you do that or who will do it? 00:16:26
Still do. 00:16:29
That that railroad will have to stay, so you'll be up there next week. 00:16:30
That's great. 00:16:34
And I'm talking about surely an informational. 00:16:37
So there's a there's a motion on the table for this item. 00:16:42
#10 We got a motion to second. All in favor, Say aye. 00:16:47
He thought he was leaving the city. Engineers, all we're driving. 00:16:53
Good morning. Trying to return, we're looking forward to that item number 11. 00:16:57
Authorization to execute a grant agreement. 00:17:04
With the FAA and and the Alabama dot. 00:17:06
The runway 422 extension environmental assessment the totals 289,336. Jeff, welcome. Good afternoon. We've talked on a couple of 00:17:10
these projects in prior meetings whether they're work authorizations or authorization to apply for the grant. We have received 00:17:16
notice for the grant award to be offered to the city. 00:17:22
The first one was offered on August 31st. 00:17:28
And we received a grant, a second grant offer on 9/6 and they notified that they'd like to have signatures by 9:15. And that's why 00:17:31
we're asking for the double up today. 00:17:36
Our service number 11 item is for the grant offer for the environmental assessment regarding the Runway 4/2 extension. 00:17:41
And that is that $289,000 is the. 00:17:50
Grant award number. 00:17:53
We budget for 10% and that is $32,148.45. 00:17:55
We're expecting the grant from the Alba side to come following this grant offer, which changed that down to 5%. 00:18:00
Someone. 00:18:08
Second move and second all in favor, say aye aye item number 11 is approved. 00:18:09
The second grant award is ready to go ahead and see where the work authority. 00:18:14
Authorization portion. 00:18:18
For 270 thousand $273,622.95. 00:18:20
And that will be concurrent with the ground award being executed as well. 00:18:25
And for the record, that is approval of work authorization for Atkins North America Design and Display Services regarding the 00:18:29
cargo. 00:18:32
And operations overflowed apron, just for the record. 00:18:37
So. 00:18:40
Second, second all in favor, Say aye, aye. 00:18:44
I'm 14. 00:18:48
Authorization Executive Grant Agreement with the FAA and AL dot for the Cargo and Operations overflow apron project. Jeff. 00:18:50
Yes, Sir. That is for the grant agreement portion for this project to coincide with the the work authorization. The grant award is 00:18:58
for $246,450. 00:19:02
The 10% match is $27,383.33. Again at the ALDOT grant offers follows our for our requirements will be 5% instead of the 10%. 00:19:06
And are these five percents, Are they in your budget somewhere? We plan for 10% when you apply for the. 00:19:18
When you applied for the grant. 00:19:26
We talked about those numbers and approved. 00:19:28
That potential match. 00:19:31
Yes, Sir. Under the 10% because we never can guarantee if Al Dot's going to be able to have the funding to persist participate in 00:19:33
5%. And this is something that I requested if I could jump in with Jeff on this items specifically in relation to that question, 00:19:38
Mr. Buzzy. 00:19:42
With the five, what we are planning for is 5%. However, at the most conservative estimate we will be budgeting for the 10% amount 00:19:48
currently. 00:19:53
If you will recall, within your elevated budget that was proposed by the mayor, there is a TCL Grant match item. 00:19:59
So that will be what's on a piece of what's on the Finance Committee for all the budget adoptions. 00:20:05
Yes Sir. So the source is going to be the TCL Grant match amount. 00:20:11
It's $1 million for fiscal 24 within the Elevate budget. 00:20:15
That's coming to you and so this afternoon obviously Jeff needs to have these doubled up on City Council for this evening and so, 00:20:19
but just be aware that if we can go ahead and add the grant. 00:20:26
Revenue items also into the Elevate budget. 00:20:35
That would help facilitate this a little bit quicker. 00:20:38
So we hear a motion. 00:20:43
Some of. 00:20:46
2nd. 00:20:54
In all the fiber say aye aye I don't #13. 00:20:56
Go ahead. 00:21:02
I remember Fort Wayne is authorization for the Chief Information Officer to execute budgeted agreements with Verizon Wireless, 00:21:03
Jason Walker. 00:21:07
Good afternoon. 00:21:11
This is similar to the other agreements that that you've authorized for Comcast and Ceasefire, which allows you to. 00:21:12
That are that are already budgeted. 00:21:23
Are they gonna dig up anything? 00:21:25
God. 00:21:30
Alright. 00:21:33
Motion seconded. All in favor? Say aye. 00:21:34
I don't know. 14 is approved. Item number 15 is approval and authorization for supplemental agreement number one to the right of 00:21:39
entry for construction for the US Army Corps of Engineer. 00:21:44
Tom. 00:21:50
Currently we have an agreement with the core of engineers regarding the construction of their new facility on. 00:21:53
Jackman Parkway. 00:21:59
And they're asking in that agreement. 00:22:01
We had a 24 month period that we granted them our right of entry to go across city property. 00:22:04
The core is asking for an additional 12 months. 00:22:09
And that for that agreement, which would extend it out to February 2026. 00:22:12
And Mr. Kevin Cauley for the course here if you have any specific questions. 00:22:17
Ohh golly, how are you? 00:22:26
What's it like? Well, what's going on is we. 00:22:30
Expect to award a contract in November. 00:22:34
Issue a notice to proceed in January. 00:22:37
And the construction time be 18 months. 00:22:41
That gets us to June of 25. 00:22:44
And our current array of entry mixed Myers in February of 25. 00:22:47
So adding another. 00:22:52
A year or two, it was a. 00:22:54
You know, get us to February 26, which should be ample time for the 18 months plus. 00:22:56
Built in the late time. 00:23:02
Tell me the impact on that. 00:23:05
No. 00:23:06
2nd is also tied into their instructions also once their construction is on. 00:23:08
Is a land swap with cord which the city would receive the land for the. 00:23:14
Smooth second all in favor. Say aye aye, Item number 15, Proof. 00:23:21
Is there any other business to be brought before our committee? 00:23:25
Our next Public Projects Committee meeting will be next Tuesday, September the 19th. I would entertain a motion to adjourn second. 00:23:29
And second, all in favor, say aye. 00:23:37