Public Projects Committee Yes, today is Tuesday, August the 22nd, our first order of business. 00:00:00
Is approval of the minutes when committee members have had a chance to review, I would entertain a motion to approve, so move Mr. 00:00:06
Chair. 00:00:10
And all in favor, say aye aye opposed minutes are approved. 00:00:15
New business item number one is authorization to execute. 00:00:19
Amendment #8 with TTL for continued administration of the 2018 SRF State Revolving Fund. 00:00:23
Loan funds total 60,000. 00:00:31
Good everyone, Kimberly. 00:00:33
Good afternoon. Yeah, this is just an amendment to the existing TTL contract and it's adding an additional $60,000. This is for 00:00:35
the additional SRF compliance work that they're doing with us, between US and AD and this is for the SRF loan. So we use for water 00:00:40
and sewer work. 00:00:46
So this is to extend that contract and then an additional amount to it, OK. 00:00:51
And it's there will be a question planning Finance Committee item with this. 00:00:57
I'm confused. Is it extending the term of the contract? Well, it's carrying expanding the amount. 00:01:00
We're paying for both. 00:01:07
So we'll go through December of this year with this the end of the year. 00:01:09
And then it's an additional $60,000. And when was it supposed to expire? 00:01:12
It was. It's an. It's an as needed services contract. 00:01:17
We're extending it. It has some kind of exploration, but I don't know the 30th this year we're extending that. 00:01:22
October, November and December. Yes for an extra 60,000. 00:01:30
And then we're increasing the scope. 00:01:35
Or that's purely the extension, That's the extension of it. But we asked for some additional work on this related to some 00:01:38
documents that we need on on the water sewer side. So there's some other additional environmental documents and things that we've 00:01:43
asked for, they're related to the SRF loan. 00:01:48
And so that's what this is and then also we're trying to, we're working towards getting the SRF administration in house and so 00:01:55
there's some training aspect or as needed aspect to this contract that will that will help us money coming from it's out of the 00:02:00
the 10 year, 10 year plan that's part of the. 00:02:05
That's what I've done. 00:02:10
OK. 00:02:11
So we're trying to bring that back in house. 00:02:13
Part of this additional three months. 00:02:16
Is them tutoring us? 00:02:18
In the administration, well it's yeah as needed services to help us, to help guide us because we're doing, we're taking on the 00:02:21
going to start taking on the role of working with Adm related to these. 00:02:26
Documents. 00:02:31
So move. 00:02:35
Second, second all in favor, say aye aye, item number one is approved. 00:02:36
Item number 22 Item number two is Approval. 00:02:41
Change order number one to the construction contract with Lavender Inc for the Aflac. 00:02:46
Storm sewer repair project that's on Rice Mine, Rd. Total is 198,804. Ninety two and a 30 day time extension. Good afternoon Mike. 00:02:50
Good afternoon, so. 00:02:59
In the course of uncovering items at the project site. 00:03:02
This is the This is basically where the storm system began. 00:03:07
This is a structure that was built in about the early 90s. 00:03:11
Part of the component of the major component of this. 00:03:19
Change order. 00:03:22
Is to reinforce the structural integrity of this box. 00:03:23
It's about 22 feet deep. 00:03:28
And. 00:03:30
We feel like this is a very important component that we need to address. 00:03:32
A subsequent failure of this box, if we don't address it, would be a catastrophic. 00:03:38
Problem. 00:03:42
And it would be probably part of an emergency contract if that were to happen. 00:03:44
So along with that change order, there's some other structures that are needing to be modified based on some. 00:03:48
In field conditions and there's a request for 30 day extension to perform this work. 00:03:55
What are we up to on this one so far, Mike? 00:04:01
This will bring it to two million 164. 00:04:04
What's our revised timeline? I don't get stopped. 00:04:12
Well, if we. 00:04:16
We could walk away, but we'd have a problem if if we did a stop work order. I think that there would be some charges for removing 00:04:18
whatnot. 00:04:22
I think this is gonna push us into. 00:04:27
October. 00:04:32
Working conditions have been been favorable and. 00:04:33
I'm hoping that Outlook stays the same. 00:04:38
They've got about 50% of the major pipe work in the ground, so it. 00:04:41
Probably go pretty quick after this. 00:04:46
Any questions from committee members? 00:04:49
Very nice to get this repaired and we move on. 00:04:52
Motion second. 00:04:55
Thank you. Seconded all in favor, say aye, aye opposed, it's approved. 00:04:56
Item number three is approval to enter into software licensing support agreement with GE Software for management services 00:05:01
associated. 00:05:05
With our feeling. 00:05:09
Stations total is 42,887 so and welcome. 00:05:10
Thank you, Mr. Chairman. 00:05:15
This is a authorization to enter into an agreement with GE software license. 00:05:17
This will provide a software licensing agreement and software support for the software platform that we use to manage our three 00:05:23
fueling stations. We have two fueling stations at what you know as the T dot campus. 00:05:30
And a third fueling station at TPD. 00:05:37
This software is what we use to account for all of our fuel usage. 00:05:40
So it identifies few usage by the individual, the car or piece of equipment used. 00:05:46
And it also tracks. 00:05:53
How much or in few people are using at any given time? 00:05:54
It also generates reports that goes to A&F for all of our billing and account information. 00:05:58
This is paid for out of operations. I was waiting for that question. 00:06:05
You're not gonna ask me? I'll say it anyway. It's covered in operation. I love Mike. I'll let Mike get the oversight. 00:06:10
Questions. 00:06:19
So is this just? 00:06:21
They have some code so that we're tracking. 00:06:23
They're still getting out of the truck, sticking a nozzle. 00:06:26
Yeah, but in order to get get few out of our fuel tanks, you have to have to key fob. 00:06:30
And you have to enter a vehicle ID number, so that key fob tells who's getting the gas. The vehicle ID number or the equipment ID 00:06:35
number tells them where they're putting it. 00:06:39
I'm good. Need some some second seconded. All in favor, say aye. 00:06:46
An item is approved. Item number three is approved. Item number four, approval to enter into professional services contract with 00:06:52
Keen Independent Research LLC for strategic planning of the Gateway Center. Total not to exceed 75,000. 00:06:59
OK. And Dakota, welcome Dakota. Yes, thank you. Good afternoon. 00:07:06
This is a contract with Keen independent research to do strategic visioning for the Gateway Center. It is funded through Elevate 00:07:10
and it is within budget. 00:07:14
We'll be conducting market analysis, business planning, facility operations and just overall visitor experience for the Gateway 00:07:19
Center to make sure that we're meeting the needs. 00:07:23
Of the community, and it's something that can be facilitated and functioned for years to come. 00:07:29
We recently. 00:07:35
You don't approve. 00:07:39
Some similar type of. 00:07:41
Professional service contract. 00:07:43
For like. 00:07:45
For that, we came to you previously to ask permission to begin. 00:07:47
The process OK and this is what it's like to Dakota when they do this they. 00:07:51
I know what we need to reinvent kind of what's going on there and. 00:07:57
Do they? I mean, they spend a lot of time probably talking with a lot of people. They interview a lot of people and they probably 00:08:02
bring what best practices? 00:08:05
To something that's similar maybe somewhere they don't. I mean I know Kim will be in the middle of this, but is that kind of? 00:08:08
How long does that process? 00:08:13
Take talk a little bit about kind of what what they will do. So that's part of their community engagement that they're gonna do. 00:08:16
They're gonna meet with various focus groups about the community to make sure that whatever does ultimately go out there is 00:08:20
something that, number one, the community wants and #2, the data supports that. It's something that will be successful out there 00:08:24
long term. 00:08:29
The actual timeline for this, we're looking at it potentially being complete in the summer of 2023. 00:08:34
So and by the end of this summer. 00:08:40
In that event, 24, not 20/30/24. 00:08:43
Yes, sorry, Timber 24, yeah. 00:08:46
OK. 00:08:49
So is it? 00:08:50
Would it be accurate? 00:08:52
To say re envisioning. 00:08:54
I mean because we're obviously. 00:08:59
Marcus study feasibility now business plan development cost budgeting and this experience conceptualization those are pre opening. 00:09:02
Services so and and we're not going to be able to compete with the savings center and we really need to reinvent what we're doing 00:09:10
and what we're providing to the community. 00:09:15
And we're really trying to provide them. They're going to tell us the trends around other cities, but we want to be that safe 00:09:19
place to attract, you know, our youth in our community where they come and they get educational and recreational opportunities. 00:09:25
But in that setting that it's the wow, you know, setting, that's what the gateway was intended to be, where everybody wants to be 00:09:32
a part of it. And we're not there right now. So this is going to help us get where we want to be. 00:09:38
I'm. 00:09:45
Real appreciative of the mayor we talked way back about. 00:09:46
I had my concerns about the saving center with some of the things because I didn't want all the money and. 00:09:51
Dreams we have the gateway just to. 00:09:57
Die. 00:09:59
And so which of course. 00:10:00
There agree. 00:10:03
And. 00:10:04
I'm really excited about that. This is the same group, by the way. That it. 00:10:06
Being used at the savings center. 00:10:11
Because my #1 concerns for the youth. 00:10:13
That aids that we all know. 00:10:17
The. 00:10:19
Need some guidance. 00:10:21
And. 00:10:22
One of the first things we're looking at. 00:10:23
Gaining. 00:10:25
Gaming. 00:10:27
Gaming is huge. Gaming is. 00:10:29
I can just see. 00:10:32
How? 00:10:33
Must have attract people. You know gaming. You can get college scholarships. 00:10:34
Yeah. 00:10:38
But looking at that and possibly. 00:10:39
Recording Studio. 00:10:41
See things. 00:10:44
It had become very. 00:10:45
It's used a lot, but it becomes just a meeting place. 00:10:47
There's people to. 00:10:51
You know not not the purpose it was. 00:10:56
So it's used a lot for meetings. 00:11:00
You got the maturity Center for that, right? 00:11:03
Something I want the kids to be able to say. 00:11:05
What are you doing? 00:11:08
The gate. 00:11:11
Right. 00:11:11
If you do get gaming, Mr. Tyler, when you promised to get NCAA 2024 on the PlayStation, yeah, you got My wife won't let me get a 00:11:14
PlayStation. 00:11:20
I'll have a special. We'll have a special spot just for you. 00:11:28
But I want to thank Dakota for all his hard work in case. 00:11:33
Because. 00:11:37
Equals my enthusiasm. 00:11:39
With the potential is amazing. 00:11:40
And this is for kids. 00:11:42
This is for kids, just like the saving center. 00:11:44
This is for kids. 00:11:47
Across the entire city, right? 00:11:48
To have opportunity to go to a place like this. 00:11:50
So does that mean you wanna make a motion? How would I wish I could but you can't make a motion. I need to check council rules, 00:11:54
but I don't think. 00:11:58
Thank you. 00:12:03
Motion. 00:12:05
Hey Matthew, you made a motion. I'll second. 00:12:06
Any other discussion all in favor, say aye. 00:12:09
Item number four is approved. Item number 5 is Approval. 00:12:12
A task order number 2 with Chambliss Chambless King Architects to provide professional services. 00:12:16
For the Tuscaloosa Tennis Center project not total, not to exceed. 00:12:21
490-6626. 00:12:25
Welcome. 00:12:27
Dakota again. And Eric, good to see. Thank you. This is Tod #2 at Chambless King. This is providing professional services and 00:12:28
construction administration once we begin the project in earnest. 00:12:34
Really this is the sub consultants originally and when we first came with TD1, we haven't made a decision yet on the potential 00:12:40
indoor tennis center expansion. 00:12:44
Cost budgeting came back, rolled that out. 00:12:49
So these TD Two was to make sure that we weren't overpaying for services that we ultimately did not need. 00:12:52
Questions. 00:12:59
It's raining money out there. 00:13:01
This this has been delayed for the reasons it should never blah blah blah. 00:13:05
Take your take your stand. 00:13:13
Look forward to that by the way, Chandler. 00:13:16
Say something. 00:13:20
Then. 00:13:22
Yeah. 00:13:25
Chandler's game is just the best. 00:13:26
I have really loved working with. 00:13:30
They are. 00:13:33
Leading up to this. 00:13:33
And they're going to do great things for the bond branch. 00:13:35
So this is all in this is. 00:13:42
That may have wrapped up in the. 00:13:45
Yeah. 00:13:48
The funding this is this half million part of the 12th. 00:13:49
Motion. 00:13:56
Move and 2nd. 00:13:58
Any further discussion on this? 00:14:01
I just want to take a shot in the audience. 00:14:05
All in favor, Say aye, Aye. 00:14:08
The motion. 00:14:11
Carries item number 5. 00:14:12
Approved. 00:14:13
Item number six is authorization to enter. 00:14:14
Into a construction contract with JT Harrison Construction for new construction. 00:14:17
Of fire station #11. The total is 4 million. 00:14:21
$836,500 and. 00:14:25
This is our fireplace net procedes vents correct? Correct. 00:14:28
Eric, well, it's awarding the, this is awarding the contract to Harrison Construction. Obviously this is the one everybody 00:14:32
Mercedes. 00:14:35
This. 00:14:39
Being paid for by the state grant. 00:14:39
So. 00:14:43
So I wanna. 00:14:44
Just. 00:14:45
Echo what you just said. 00:14:46
This money is being paid by the state of Alabama, or if we pay for it, we're reimbursed. 00:14:47
So this is not the city's not out. Any money on this? 00:14:53
For this wonderful new facility that Harrison constructs. 00:14:56
Will build for us. So no, I have my my memory is we not only get the station built at no cost, we're acquiring paid firefighters, 00:14:59
right? 00:15:05
Of project rosewood agreement. 00:15:12
Negotiate. 00:15:14
Early night. 00:15:15
The city agreed. 00:15:16
By Fire Protection. 00:15:17
Or the first plan? 00:15:19
Of. 00:15:20
Power protection included. 00:15:21
Fire station. 00:15:23
In personnel calls. 00:15:25
That personnel call. 00:15:26
This past budget year was close to 1,000,000. 00:15:28
Around the time of COVID. 00:15:31
Mercedes. 00:15:33
Interested in? 00:15:34
Power Project. 00:15:36
Thank you. 00:15:37
Certainly have added a lot since the 90s. 00:15:38
Glenda and then Scott. 00:15:43
Led our negotiations along with chief. 00:15:45
Yeah. 00:15:48
With the state. 00:15:48
And as part of that agreement, Mercedes. 00:15:51
And the state of Alabama. The state of Alabama is funding $10 million towards a new fire station and the equipment. 00:15:53
The vehicles within that first. 00:15:59
This bid. 00:16:02
$1.2 million lower than the anticipated budget, so that. 00:16:02
Hopefully. Maybe. That's a harbinger of things to come. 00:16:07
Also as part of that, the additional men. 00:16:11
That will be needed or additional firefighters that will be needed. 00:16:14
Mercedes is covering the cost of those. 00:16:17
Additional. 00:16:19
So. 00:16:21
Certainly it's a it's a good deal for the community. 00:16:22
Um. 00:16:25
It's certainly. 00:16:26
Going to. 00:16:27
Ensure that Mercedes continues to. 00:16:29
Employed 1000. 00:16:31
People. 00:16:32
And also too, that the city is not alone. 00:16:33
And bearing all the cost. 00:16:36
That go into protecting that economic invest. 00:16:38
Questions for Eric. 00:16:44
Otherwise, entertain a motion to approve. So moved, second moved, and seconded. All in favor, say aye. 00:16:47
Item number six is approved Item number 7. 00:16:53
Approval of Task Order Directive #2 to Construction Administration Contract. 00:16:56
With William Blackstock Architects for the construction of Fire Station #11. 00:17:01
The total is 221,000. 00:17:05
$860 Eric. 00:17:08
So this is to award a Williams Blackstock. This is also part of the state grant. 00:17:10
Questions for Eric. 00:17:14
Motion to Approve. 00:17:17
2nd. 00:17:22
Moved and seconded all in favor. Say aye aye, item number 7. 00:17:23
Item number eight, approval. 00:17:27
This is where it gets really expensive. Here looks like approval to enter into minor public works contract with cutting edge. 00:17:29
Unlimited for intermodal facility pressure washing. 00:17:35
Total 5188, so this is to pressure wash the IMF. 00:17:38
We've had crews going in. 00:17:44
Using overtime hours in city equipment, trying to get caught up on that. 00:17:46
Got to a point where we need to get to some of the areas that are up a lot higher and we can't do that without renting a manlet. 00:17:50
The numbers didn't workout, so we contracted this out. 00:17:56
And if I could, I know it's a little out of character or out of sync, but. 00:17:59
Like to recognize Mccarley? 00:18:03
Thomas over here. 00:18:05
And Heather Gray. 00:18:06
These are the people that I call every time something breaks. 00:18:08
And so I mean literally, these are. 00:18:11
These are the people in my film that I call. I just wanted to give them a little bit of recognize. 00:18:14
Thank you. It's good to know who to call. 00:18:19
Yeah. 00:18:22
Good, So move. 00:18:23
Second move, second all in favor? Say aye. 00:18:24
Item number 8 is approved. Item number 9 is approval to enter into minor public works contract with Serpro. 00:18:27
Or IT Radio shop air duct cleaning the totals $2690.00 This is another modern public works contract. This is. 00:18:33
Yes Sir, Pro out. Clean the air ducts over the radio shop. 00:18:40
We've had several of these coming through here late. 00:18:45
Keep everything. 00:18:47
All of these are coming out of your. 00:18:49
Maintenance. 00:18:50
It's not an outside. 00:18:51
Motion second moved and seconded. All in favor? Say aye. 00:18:54
Motion. 00:18:59
It's free. Is there any other business to be brought before this committee? 00:19:00
Motion to adjourn. 00:19:04
Motion to adjourn. 00:19:05
And our next public projects committee meeting. 00:19:08
Will be Tuesday, August 29th, next Tuesday at 2:30. 00:19:10
I've got a motion and a second all in favor. Say aye, aye. 00:19:15
We're adjourned. 00:19:18

Link

Start video at

Social

Embed


* you need to log in to manage your favorites

My Favorites List
You haven't added any favorites yet. Click the "Add Favorite" button on any media page, and they'll show up here.
* use Ctrl+F (Cmd+F on Mac) to search in document
Loading...
Unable to preview the file.
* use Ctrl+F (Cmd+F on Mac) to search in document
Loading...
Unable to preview the file.
Public Projects Committee Yes, today is Tuesday, August the 22nd, our first order of business. 00:00:00
Is approval of the minutes when committee members have had a chance to review, I would entertain a motion to approve, so move Mr. 00:00:06
Chair. 00:00:10
And all in favor, say aye aye opposed minutes are approved. 00:00:15
New business item number one is authorization to execute. 00:00:19
Amendment #8 with TTL for continued administration of the 2018 SRF State Revolving Fund. 00:00:23
Loan funds total 60,000. 00:00:31
Good everyone, Kimberly. 00:00:33
Good afternoon. Yeah, this is just an amendment to the existing TTL contract and it's adding an additional $60,000. This is for 00:00:35
the additional SRF compliance work that they're doing with us, between US and AD and this is for the SRF loan. So we use for water 00:00:40
and sewer work. 00:00:46
So this is to extend that contract and then an additional amount to it, OK. 00:00:51
And it's there will be a question planning Finance Committee item with this. 00:00:57
I'm confused. Is it extending the term of the contract? Well, it's carrying expanding the amount. 00:01:00
We're paying for both. 00:01:07
So we'll go through December of this year with this the end of the year. 00:01:09
And then it's an additional $60,000. And when was it supposed to expire? 00:01:12
It was. It's an. It's an as needed services contract. 00:01:17
We're extending it. It has some kind of exploration, but I don't know the 30th this year we're extending that. 00:01:22
October, November and December. Yes for an extra 60,000. 00:01:30
And then we're increasing the scope. 00:01:35
Or that's purely the extension, That's the extension of it. But we asked for some additional work on this related to some 00:01:38
documents that we need on on the water sewer side. So there's some other additional environmental documents and things that we've 00:01:43
asked for, they're related to the SRF loan. 00:01:48
And so that's what this is and then also we're trying to, we're working towards getting the SRF administration in house and so 00:01:55
there's some training aspect or as needed aspect to this contract that will that will help us money coming from it's out of the 00:02:00
the 10 year, 10 year plan that's part of the. 00:02:05
That's what I've done. 00:02:10
OK. 00:02:11
So we're trying to bring that back in house. 00:02:13
Part of this additional three months. 00:02:16
Is them tutoring us? 00:02:18
In the administration, well it's yeah as needed services to help us, to help guide us because we're doing, we're taking on the 00:02:21
going to start taking on the role of working with Adm related to these. 00:02:26
Documents. 00:02:31
So move. 00:02:35
Second, second all in favor, say aye aye, item number one is approved. 00:02:36
Item number 22 Item number two is Approval. 00:02:41
Change order number one to the construction contract with Lavender Inc for the Aflac. 00:02:46
Storm sewer repair project that's on Rice Mine, Rd. Total is 198,804. Ninety two and a 30 day time extension. Good afternoon Mike. 00:02:50
Good afternoon, so. 00:02:59
In the course of uncovering items at the project site. 00:03:02
This is the This is basically where the storm system began. 00:03:07
This is a structure that was built in about the early 90s. 00:03:11
Part of the component of the major component of this. 00:03:19
Change order. 00:03:22
Is to reinforce the structural integrity of this box. 00:03:23
It's about 22 feet deep. 00:03:28
And. 00:03:30
We feel like this is a very important component that we need to address. 00:03:32
A subsequent failure of this box, if we don't address it, would be a catastrophic. 00:03:38
Problem. 00:03:42
And it would be probably part of an emergency contract if that were to happen. 00:03:44
So along with that change order, there's some other structures that are needing to be modified based on some. 00:03:48
In field conditions and there's a request for 30 day extension to perform this work. 00:03:55
What are we up to on this one so far, Mike? 00:04:01
This will bring it to two million 164. 00:04:04
What's our revised timeline? I don't get stopped. 00:04:12
Well, if we. 00:04:16
We could walk away, but we'd have a problem if if we did a stop work order. I think that there would be some charges for removing 00:04:18
whatnot. 00:04:22
I think this is gonna push us into. 00:04:27
October. 00:04:32
Working conditions have been been favorable and. 00:04:33
I'm hoping that Outlook stays the same. 00:04:38
They've got about 50% of the major pipe work in the ground, so it. 00:04:41
Probably go pretty quick after this. 00:04:46
Any questions from committee members? 00:04:49
Very nice to get this repaired and we move on. 00:04:52
Motion second. 00:04:55
Thank you. Seconded all in favor, say aye, aye opposed, it's approved. 00:04:56
Item number three is approval to enter into software licensing support agreement with GE Software for management services 00:05:01
associated. 00:05:05
With our feeling. 00:05:09
Stations total is 42,887 so and welcome. 00:05:10
Thank you, Mr. Chairman. 00:05:15
This is a authorization to enter into an agreement with GE software license. 00:05:17
This will provide a software licensing agreement and software support for the software platform that we use to manage our three 00:05:23
fueling stations. We have two fueling stations at what you know as the T dot campus. 00:05:30
And a third fueling station at TPD. 00:05:37
This software is what we use to account for all of our fuel usage. 00:05:40
So it identifies few usage by the individual, the car or piece of equipment used. 00:05:46
And it also tracks. 00:05:53
How much or in few people are using at any given time? 00:05:54
It also generates reports that goes to A&F for all of our billing and account information. 00:05:58
This is paid for out of operations. I was waiting for that question. 00:06:05
You're not gonna ask me? I'll say it anyway. It's covered in operation. I love Mike. I'll let Mike get the oversight. 00:06:10
Questions. 00:06:19
So is this just? 00:06:21
They have some code so that we're tracking. 00:06:23
They're still getting out of the truck, sticking a nozzle. 00:06:26
Yeah, but in order to get get few out of our fuel tanks, you have to have to key fob. 00:06:30
And you have to enter a vehicle ID number, so that key fob tells who's getting the gas. The vehicle ID number or the equipment ID 00:06:35
number tells them where they're putting it. 00:06:39
I'm good. Need some some second seconded. All in favor, say aye. 00:06:46
An item is approved. Item number three is approved. Item number four, approval to enter into professional services contract with 00:06:52
Keen Independent Research LLC for strategic planning of the Gateway Center. Total not to exceed 75,000. 00:06:59
OK. And Dakota, welcome Dakota. Yes, thank you. Good afternoon. 00:07:06
This is a contract with Keen independent research to do strategic visioning for the Gateway Center. It is funded through Elevate 00:07:10
and it is within budget. 00:07:14
We'll be conducting market analysis, business planning, facility operations and just overall visitor experience for the Gateway 00:07:19
Center to make sure that we're meeting the needs. 00:07:23
Of the community, and it's something that can be facilitated and functioned for years to come. 00:07:29
We recently. 00:07:35
You don't approve. 00:07:39
Some similar type of. 00:07:41
Professional service contract. 00:07:43
For like. 00:07:45
For that, we came to you previously to ask permission to begin. 00:07:47
The process OK and this is what it's like to Dakota when they do this they. 00:07:51
I know what we need to reinvent kind of what's going on there and. 00:07:57
Do they? I mean, they spend a lot of time probably talking with a lot of people. They interview a lot of people and they probably 00:08:02
bring what best practices? 00:08:05
To something that's similar maybe somewhere they don't. I mean I know Kim will be in the middle of this, but is that kind of? 00:08:08
How long does that process? 00:08:13
Take talk a little bit about kind of what what they will do. So that's part of their community engagement that they're gonna do. 00:08:16
They're gonna meet with various focus groups about the community to make sure that whatever does ultimately go out there is 00:08:20
something that, number one, the community wants and #2, the data supports that. It's something that will be successful out there 00:08:24
long term. 00:08:29
The actual timeline for this, we're looking at it potentially being complete in the summer of 2023. 00:08:34
So and by the end of this summer. 00:08:40
In that event, 24, not 20/30/24. 00:08:43
Yes, sorry, Timber 24, yeah. 00:08:46
OK. 00:08:49
So is it? 00:08:50
Would it be accurate? 00:08:52
To say re envisioning. 00:08:54
I mean because we're obviously. 00:08:59
Marcus study feasibility now business plan development cost budgeting and this experience conceptualization those are pre opening. 00:09:02
Services so and and we're not going to be able to compete with the savings center and we really need to reinvent what we're doing 00:09:10
and what we're providing to the community. 00:09:15
And we're really trying to provide them. They're going to tell us the trends around other cities, but we want to be that safe 00:09:19
place to attract, you know, our youth in our community where they come and they get educational and recreational opportunities. 00:09:25
But in that setting that it's the wow, you know, setting, that's what the gateway was intended to be, where everybody wants to be 00:09:32
a part of it. And we're not there right now. So this is going to help us get where we want to be. 00:09:38
I'm. 00:09:45
Real appreciative of the mayor we talked way back about. 00:09:46
I had my concerns about the saving center with some of the things because I didn't want all the money and. 00:09:51
Dreams we have the gateway just to. 00:09:57
Die. 00:09:59
And so which of course. 00:10:00
There agree. 00:10:03
And. 00:10:04
I'm really excited about that. This is the same group, by the way. That it. 00:10:06
Being used at the savings center. 00:10:11
Because my #1 concerns for the youth. 00:10:13
That aids that we all know. 00:10:17
The. 00:10:19
Need some guidance. 00:10:21
And. 00:10:22
One of the first things we're looking at. 00:10:23
Gaining. 00:10:25
Gaming. 00:10:27
Gaming is huge. Gaming is. 00:10:29
I can just see. 00:10:32
How? 00:10:33
Must have attract people. You know gaming. You can get college scholarships. 00:10:34
Yeah. 00:10:38
But looking at that and possibly. 00:10:39
Recording Studio. 00:10:41
See things. 00:10:44
It had become very. 00:10:45
It's used a lot, but it becomes just a meeting place. 00:10:47
There's people to. 00:10:51
You know not not the purpose it was. 00:10:56
So it's used a lot for meetings. 00:11:00
You got the maturity Center for that, right? 00:11:03
Something I want the kids to be able to say. 00:11:05
What are you doing? 00:11:08
The gate. 00:11:11
Right. 00:11:11
If you do get gaming, Mr. Tyler, when you promised to get NCAA 2024 on the PlayStation, yeah, you got My wife won't let me get a 00:11:14
PlayStation. 00:11:20
I'll have a special. We'll have a special spot just for you. 00:11:28
But I want to thank Dakota for all his hard work in case. 00:11:33
Because. 00:11:37
Equals my enthusiasm. 00:11:39
With the potential is amazing. 00:11:40
And this is for kids. 00:11:42
This is for kids, just like the saving center. 00:11:44
This is for kids. 00:11:47
Across the entire city, right? 00:11:48
To have opportunity to go to a place like this. 00:11:50
So does that mean you wanna make a motion? How would I wish I could but you can't make a motion. I need to check council rules, 00:11:54
but I don't think. 00:11:58
Thank you. 00:12:03
Motion. 00:12:05
Hey Matthew, you made a motion. I'll second. 00:12:06
Any other discussion all in favor, say aye. 00:12:09
Item number four is approved. Item number 5 is Approval. 00:12:12
A task order number 2 with Chambliss Chambless King Architects to provide professional services. 00:12:16
For the Tuscaloosa Tennis Center project not total, not to exceed. 00:12:21
490-6626. 00:12:25
Welcome. 00:12:27
Dakota again. And Eric, good to see. Thank you. This is Tod #2 at Chambless King. This is providing professional services and 00:12:28
construction administration once we begin the project in earnest. 00:12:34
Really this is the sub consultants originally and when we first came with TD1, we haven't made a decision yet on the potential 00:12:40
indoor tennis center expansion. 00:12:44
Cost budgeting came back, rolled that out. 00:12:49
So these TD Two was to make sure that we weren't overpaying for services that we ultimately did not need. 00:12:52
Questions. 00:12:59
It's raining money out there. 00:13:01
This this has been delayed for the reasons it should never blah blah blah. 00:13:05
Take your take your stand. 00:13:13
Look forward to that by the way, Chandler. 00:13:16
Say something. 00:13:20
Then. 00:13:22
Yeah. 00:13:25
Chandler's game is just the best. 00:13:26
I have really loved working with. 00:13:30
They are. 00:13:33
Leading up to this. 00:13:33
And they're going to do great things for the bond branch. 00:13:35
So this is all in this is. 00:13:42
That may have wrapped up in the. 00:13:45
Yeah. 00:13:48
The funding this is this half million part of the 12th. 00:13:49
Motion. 00:13:56
Move and 2nd. 00:13:58
Any further discussion on this? 00:14:01
I just want to take a shot in the audience. 00:14:05
All in favor, Say aye, Aye. 00:14:08
The motion. 00:14:11
Carries item number 5. 00:14:12
Approved. 00:14:13
Item number six is authorization to enter. 00:14:14
Into a construction contract with JT Harrison Construction for new construction. 00:14:17
Of fire station #11. The total is 4 million. 00:14:21
$836,500 and. 00:14:25
This is our fireplace net procedes vents correct? Correct. 00:14:28
Eric, well, it's awarding the, this is awarding the contract to Harrison Construction. Obviously this is the one everybody 00:14:32
Mercedes. 00:14:35
This. 00:14:39
Being paid for by the state grant. 00:14:39
So. 00:14:43
So I wanna. 00:14:44
Just. 00:14:45
Echo what you just said. 00:14:46
This money is being paid by the state of Alabama, or if we pay for it, we're reimbursed. 00:14:47
So this is not the city's not out. Any money on this? 00:14:53
For this wonderful new facility that Harrison constructs. 00:14:56
Will build for us. So no, I have my my memory is we not only get the station built at no cost, we're acquiring paid firefighters, 00:14:59
right? 00:15:05
Of project rosewood agreement. 00:15:12
Negotiate. 00:15:14
Early night. 00:15:15
The city agreed. 00:15:16
By Fire Protection. 00:15:17
Or the first plan? 00:15:19
Of. 00:15:20
Power protection included. 00:15:21
Fire station. 00:15:23
In personnel calls. 00:15:25
That personnel call. 00:15:26
This past budget year was close to 1,000,000. 00:15:28
Around the time of COVID. 00:15:31
Mercedes. 00:15:33
Interested in? 00:15:34
Power Project. 00:15:36
Thank you. 00:15:37
Certainly have added a lot since the 90s. 00:15:38
Glenda and then Scott. 00:15:43
Led our negotiations along with chief. 00:15:45
Yeah. 00:15:48
With the state. 00:15:48
And as part of that agreement, Mercedes. 00:15:51
And the state of Alabama. The state of Alabama is funding $10 million towards a new fire station and the equipment. 00:15:53
The vehicles within that first. 00:15:59
This bid. 00:16:02
$1.2 million lower than the anticipated budget, so that. 00:16:02
Hopefully. Maybe. That's a harbinger of things to come. 00:16:07
Also as part of that, the additional men. 00:16:11
That will be needed or additional firefighters that will be needed. 00:16:14
Mercedes is covering the cost of those. 00:16:17
Additional. 00:16:19
So. 00:16:21
Certainly it's a it's a good deal for the community. 00:16:22
Um. 00:16:25
It's certainly. 00:16:26
Going to. 00:16:27
Ensure that Mercedes continues to. 00:16:29
Employed 1000. 00:16:31
People. 00:16:32
And also too, that the city is not alone. 00:16:33
And bearing all the cost. 00:16:36
That go into protecting that economic invest. 00:16:38
Questions for Eric. 00:16:44
Otherwise, entertain a motion to approve. So moved, second moved, and seconded. All in favor, say aye. 00:16:47
Item number six is approved Item number 7. 00:16:53
Approval of Task Order Directive #2 to Construction Administration Contract. 00:16:56
With William Blackstock Architects for the construction of Fire Station #11. 00:17:01
The total is 221,000. 00:17:05
$860 Eric. 00:17:08
So this is to award a Williams Blackstock. This is also part of the state grant. 00:17:10
Questions for Eric. 00:17:14
Motion to Approve. 00:17:17
2nd. 00:17:22
Moved and seconded all in favor. Say aye aye, item number 7. 00:17:23
Item number eight, approval. 00:17:27
This is where it gets really expensive. Here looks like approval to enter into minor public works contract with cutting edge. 00:17:29
Unlimited for intermodal facility pressure washing. 00:17:35
Total 5188, so this is to pressure wash the IMF. 00:17:38
We've had crews going in. 00:17:44
Using overtime hours in city equipment, trying to get caught up on that. 00:17:46
Got to a point where we need to get to some of the areas that are up a lot higher and we can't do that without renting a manlet. 00:17:50
The numbers didn't workout, so we contracted this out. 00:17:56
And if I could, I know it's a little out of character or out of sync, but. 00:17:59
Like to recognize Mccarley? 00:18:03
Thomas over here. 00:18:05
And Heather Gray. 00:18:06
These are the people that I call every time something breaks. 00:18:08
And so I mean literally, these are. 00:18:11
These are the people in my film that I call. I just wanted to give them a little bit of recognize. 00:18:14
Thank you. It's good to know who to call. 00:18:19
Yeah. 00:18:22
Good, So move. 00:18:23
Second move, second all in favor? Say aye. 00:18:24
Item number 8 is approved. Item number 9 is approval to enter into minor public works contract with Serpro. 00:18:27
Or IT Radio shop air duct cleaning the totals $2690.00 This is another modern public works contract. This is. 00:18:33
Yes Sir, Pro out. Clean the air ducts over the radio shop. 00:18:40
We've had several of these coming through here late. 00:18:45
Keep everything. 00:18:47
All of these are coming out of your. 00:18:49
Maintenance. 00:18:50
It's not an outside. 00:18:51
Motion second moved and seconded. All in favor? Say aye. 00:18:54
Motion. 00:18:59
It's free. Is there any other business to be brought before this committee? 00:19:00
Motion to adjourn. 00:19:04
Motion to adjourn. 00:19:05
And our next public projects committee meeting. 00:19:08
Will be Tuesday, August 29th, next Tuesday at 2:30. 00:19:10
I've got a motion and a second all in favor. Say aye, aye. 00:19:15
We're adjourned. 00:19:18