August the 15th, our first order of business is approval. 00:00:01
Of the minutes when committee members have had a chance to review it, I would entertain a motion to approve. 00:00:05
Motion. 00:00:11
Second moved and seconded. Any discussion all in favor? Say aye, aye? 00:00:12
Minutes. 00:00:17
Are approved new business. Item number one is approval. 00:00:18
Of balancing change order to the contract with St. Bond Construction. 00:00:22
For the ESD parking project. 00:00:26
Wow. It's a deductive total of 57,477 thirds second. 00:00:29
I mean my I really want you to come back more with this kind of news. This is so good because. 00:00:37
We've got so many paving opportunities in this city. Do we know, Mr. Gurney, that we need to be taken care of? 00:00:43
I'll wait. If we had the opportunity to do this more often too. Me too. I might. I might cry. Mike, it's great. It's great. News 00:00:48
Project turned out well, and as you can see, we were. 00:00:53
Well. 00:00:58
That's awesome. We appreciate you. Appreciate you. 00:01:00
Do I hear a motion? I think I got a motion and a motion. Motion. Second, all in favor, say aye. 00:01:03
No item number one is free. 00:01:08
Yeah. 00:01:12
Mr. Tyler, I will explain to you why you need to vote yes later. Now item number two is authorization to submit grant application 00:01:12
with the US Department of Transportation for project for a project. 00:01:18
Ohh God Project protect. 00:01:24
Planning grant to fund Cribbs Mill Creek drainage design No match. 00:01:26
Right. Well, Sir. 00:01:29
So. 00:01:31
What this is we did? 00:01:33
May remember we did a study. 00:01:34
All Prismo Creek number 1/2. 00:01:36
Which are basically the tributaries, if you think 15th Street by Cookout. 00:01:39
That's where there's. 00:01:44
Like to buy just upstream of there behind behind DCH and all that it does reach near the railroad tracks and all that that we did, 00:01:46
we do this funding we funded. 00:01:51
Looking at it right, the study with you guys study. 00:01:59
Identified a solution and that solution is. 00:02:02
$33 million. 00:02:06
So obviously that's something that's gonna need outside assistance with this app, what this request is? 00:02:08
Request for authorization to apply for Protect grant. 00:02:15
To do the engineering will be the next step. 00:02:18
And. 00:02:21
That's significant and so that's $1.2 million. 00:02:22
They're about. 00:02:25
Home. 00:02:27
No match. It would set us up to be in position. 00:02:28
Then you're after. 00:02:32
The same type of grant funding for. 00:02:34
Questions So so this is also the one that hits. 00:02:38
What I call Parkview, but it may have a. 00:02:42
15th St. and 10th Ave. 00:02:46
That's not the same basis. 00:02:49
Parkview Basin. 00:02:54
Runs out, so the Parkview is really at the top of the base. 00:02:56
There's some, there's some more stuff on the north side of the railroad tracks. 00:03:01
But it goes. 00:03:05
Actually through close system across central athletic fields and Forest Lake. 00:03:08
Yeah, they're they're a little bit of force, like and then, you know, the truth is the little. 00:03:14
A channel where you're Hard Road and 2nd Ave. 00:03:18
Ohh down there that's that's kind of where that. 00:03:22
Eventually gets free flow. OK, so in a in a partnership like. 00:03:26
It's just with the university who who takes a lead. 00:03:31
But we're the. We're. We have to be the. 00:03:35
The sponsor of the local municipal. 00:03:39
OK. What's the, what's the time frame, Brian, I mean if we. 00:03:44
Well, we know. 00:03:49
If we if we're awarded. 00:03:50
I'm unsure of when will those. 00:03:53
If we're awarded. 00:03:56
Expected 90 days under the obligation dates. They requirement is in two years, September. 00:03:58
Of 25 it's gonna be completed, so I would expect. 00:04:03
You know by the end of the. 00:04:07
I said 90 days. 00:04:09
Do we know how competitive this particular grant? 00:04:11
Is. 00:04:14
I think it's. 00:04:16
Highly. 00:04:17
Sitting in meetings, talking about. 00:04:21
Right. Better do this for us. 00:04:24
I'm sorry Ron. So the about the obligation date is not the completion of the study date. The obligation date is just that we are 00:04:28
under contract and that we are we have obligated the funds through that so. 00:04:35
That dot has reviewed the contract and has approved that we can spend their money on the contract. That's all the obligations they 00:04:42
need. 00:04:46
Um. 00:04:49
Does it protect us? This is the first year they've done it and so it's a brand new. 00:04:50
Opportunity for the city of Tuscaloosa to be able to apply for it. It's just it's been made specifically for. 00:04:55
Basically our. 00:05:01
Needs exactly for this style of a of a project to apply. There are two separate types of applications that you can have through 00:05:02
protect. One is a planning grant and one of the actual construction grant. If we fulfill the planning side of things, we might be 00:05:07
in a better city. 00:05:12
Scenario here to apply for the construction grant the next time around. 00:05:18
This is a significant project, probably about, what, $15 million? 00:05:23
Approximately 12. 00:05:27
Construction and thought you said 33 so. 00:05:28
When we were doing it for build a couple of years ago, but so that was. 00:05:33
You know, we wouldn't be able to really fund this on our own without. 00:05:37
Possible federal help and so we're trying to get in the best possible scenario to be able. 00:05:41
To do that. 00:05:45
Is is is this internal Gray matter? Doing this Gray matter is doing the full application in conjunction with the University of 00:05:47
Alabama and algod. 00:05:52
Let's go ahead. 00:05:58
Some of the the parameters, I guess they're they're the criteria they're. 00:06:00
They're looking at is. 00:06:04
Of supply chains, you know they want resilient supply chains and so if we think this is. 00:06:06
Good qualifier for that with the railroad track. 00:06:11
The highway. 00:06:14
Nice. 00:06:16
That's good. That's something that. 00:06:17
I'm good with it. Yeah. Motion moved, seconded. All in favor, say aye, opposed. Item number two is approved. Thank you, Brian. 00:06:20
#3 is authorization for adoption of airport rent abatement and hanger development policy. Welcome, Jeff. 00:06:30
Good afternoon. 00:06:37
These first two items are associated. We've had various council members ask us to look into a potential incentive policy. We've 00:06:39
had the Airport Advisory Committee ask us to to do the same. When we looked at various concepts to try to figure out how can we 00:06:45
address the 100% capacity that we have in the airport, we've had it. 00:06:52
I know at least for the past 10-15 years, if not longer, and trying to find ways to encourage development that promotes more 00:06:59
capacity. 00:07:02
At the airport we've had some developments across the the airfield, but this one specifically is trying to promote development of 00:07:06
multiple aircraft. 00:07:10
In one development, sometimes they're called shade ports. T hangers, community hangers are all different layouts. 00:07:13
The basic premise is that there they can hold multiple aircraft for multiple people and that helps us grow the airport. 00:07:20
And we looked at grant type programs. 00:07:27
We've looked at funding it purely from a City side, We've looked at or try to work with parties that have done it with 100% 00:07:30
private. 00:07:33
Funding. 00:07:37
So our recommendation is looking at kind of a public private partnership. 00:07:38
Into where we look at simply a rent abatement up to five years and seeing if we can help offset those initial construction costs, 00:07:42
give them the ability to get a return on their investment. 00:07:47
And see what this policy has the the recommendation is limited only for 12 months and then we come back and just review it. 00:07:51
And seeing if it's up to update our asset, right, absolutely. I mean that's important. 00:07:58
What? 00:08:05
When we say the airport. 00:08:06
Is that 100%? 00:08:08
Occupancy for over 10 years. 00:08:10
That that does not include the two FBO's. 00:08:13
It does it all. The hangers that they have, the hangers that we lease, the private hangers on the airport, everyone is really, so 00:08:17
our spaces and their spaces are all book. 00:08:22
Absolutely. 00:08:27
You know. 00:08:30
Jeff, I I know you and I've had several conversations about this, but. 00:08:31
I'm very appreciative. 00:08:37
Of of the willingness to step out and look inside, This is kind of a different way of doing things right because I think the more. 00:08:40
These public private partnerships, I think really, really, really work well if if we structure in the right way. 00:08:47
And and we incentivize somebody to do this and then it's upgrading our asset, right. And absolutely and it keeps the city from 00:08:53
probably having to spend. 00:08:57
Millions of dollars. 00:09:02
And hopefully my car airport better and we can get the terminal fix. We're going to be in a great. 00:09:04
Either a new terminal or whatever we're going to do, right? That's that's. 00:09:09
I think that's. 00:09:12
Big Data one. Kudos. 00:09:13
To you and. 00:09:15
The Airport Advisory Committee, I'm assuming they're behind this? Yes Sir. Correct. And vetted this. 00:09:16
How many How many 100 spaces do we have? 00:09:21
We have over about 106 aircraft and so. 00:09:25
Comes down around 25 to 28 hangers. 00:09:28
What do you think are expected to handle? 00:09:32
Number would be. 00:09:34
Our new number, yes. 00:09:36
This will grow six additional spaces. 00:09:37
For the airport. 00:09:40
This one or the development that's coming in behind this recommendation, we have a lease that wants to take advantage of this now. 00:09:42
So their proposal to add six more spots and we're going to put this on our our airports website. 00:09:49
To let everybody know that people can take advantage of this. 00:09:54
It can be people that are currently on the airport can. 00:09:56
Take advantage of this, and any new tenants can take advantage. Do you have two? Councilman Wilson's point if you're going to 00:10:00
start, if we approve that item with six? 00:10:04
Do you have an estimated number that? 00:10:08
You think this might? 00:10:11
Could generate? I mean, what's your expectation of what? 00:10:13
This policy we would like. 00:10:15
We would like to see getting closer between 130 and 150 spots on the airport, so we have one. 00:10:18
Interested party now? 00:10:24
I think as we get it more out there in the public that it's available, we'll probably see some from additional interested parties. 00:10:25
How much room do you have or have? 00:10:33
Can you tell? 00:10:36
I mean, if you just want Christ. 00:10:38
We've probably got. 00:10:41
200 acres of developable land that's not being used currently. 00:10:42
But it wouldn't. It wouldn't hurt the future for plane landing or. 00:10:46
No, Sir. It's part of our master plan shows us where we have ample locations. So depending on the size and top of the velopment, 00:10:50
we kind of know where to put it on the airports or kind of efficiently locating everything. 00:10:55
So we've probably easily got 50 plus acres for this small size of the developer. 00:11:01
Jeff, will you go back and repeat something that you said that? 00:11:06
Anybody can apply to do this? 00:11:11
There's not one firm that's going to do this. 00:11:13
This is open to people that are leasing space from us right now. 00:11:16
And other people that would like to lease space that have been. 00:11:20
Turned down because they're. 00:11:24
All the space is being used because I know some people will say thanks to me that some people have hangers. 00:11:26
And they're not even using. 00:11:31
They don't have a plane in them. 00:11:32
But but this will allow. 00:11:34
Ultimately, more funds for the city. 00:11:37
And for development of our airport, correct it will. So I think that's important for the public to know. 00:11:39
And and there's not one person that's doing it, it's. 00:11:46
Multiple people. Is this coordinated with our FBS? 00:11:49
It's coordinated with the advisory committee. So our FBO's are a tenant just locked our private, that's what I'm asking, but 00:11:52
they're a tenant who also. 00:11:56
Creates and leases spaces, right. That's correct. Within there are lease parcel that they have. 00:12:00
So what I'm trying to get at is. 00:12:07
Is. 00:12:10
We're not stepping. 00:12:11
We're not stepping. 00:12:13
On our. 00:12:15
Our contracts with them. 00:12:16
Yes, we we are not, we are not we're not impeding and they are eligible to apply for this abatement as well. We're not like. 00:12:19
The franchise or licensing? 00:12:28
A Starbucks here. 00:12:30
And then? 00:12:33
On the block on either side, a year later, that's what I'm trying to get at. So an example, if they've got 10 acres within their 00:12:34
lease property that they haven't developed yet. 00:12:39
They can take five of those acres and apply it to this policy and get renovate milk. 00:12:44
For that acre within there. 00:12:49
There at least area that's good. 00:12:51
I'm good, so moved second. 00:12:53
Any other discussion all in favor, say aye. 00:12:55
The item is approved. That's item number one. 00:13:00
3. 00:13:03
Item number four is authorization for the Mayor to execute a hanger lease agreement with Tailwind and Blue Sky. 00:13:04
Aviation LLC. Jeff this is our our first interested party to take advantage of the rent abatement policy. They are interested in 00:13:10
building AT Hangar consisting OF6 aircraft. 00:13:17
They're to locate centrally on the airport just northwest of the main terminal. 00:13:23
Where the TPD hanger is, that's where they would like to locate and like to take advantage of a five year rent. 00:13:29
So. 00:13:36
They're gonna build a new hire. 00:13:37
That's correct. 00:13:39
The way that I had a, where are they from? 00:13:41
Their local Mr. Phillip Connard and Matt Mattis. 00:13:43
Macau. 00:13:48
Caddis with civil works construction. 00:13:49
Ohh, I'm glad that. 00:13:52
Yes, Sir. So they're they're basically gonna build the hangar. They're gonna give him an abatement like on for five years to help 00:13:54
them also. 00:13:57
And build new. 00:14:01
Build brand new on our. 00:14:02
On our property, so move. 00:14:04
That's good. 00:14:08
2nd. 00:14:10
Moved and seconded. All in favor, say aye aye. Item number four is approved. Item number 5 is approval. 00:14:11
Of work authorization with Atkins North America to provide design and bid phase services for runway 1230 crack seal coat. 00:14:18
Project $498,000, Jeff. 00:14:25
So the next two are associated. This is our first step in getting Atkins to provide the bid and design phases. 00:14:29
For a 5050 grant, that's alpha only. Typically we do an FANL dot grant. This is a aldot only for. 00:14:37
Pavement maintenance we are. 00:14:44
Needing to provide a seal coat and crack repair on the short runway. 00:14:46
Something of note with that particular piece of infrastructure is not FAA eligible. 00:14:51
So we are, we are very fortunate that ALDOT was willing to fund 50% of this. 00:14:56
Pavement maintenance. 00:15:01
And the number actually should be updated to 99,791. 00:15:02
And $0.31. 00:15:07
It is. 00:15:09
Once they are gone through the design and bid phase, they'll come back and apply that number and that will allow our dot to award 00:15:13
the grant to the City of Tuscaloosa. 00:15:17
This, says construction phase services also include all three. 00:15:24
Someone. 00:15:30
Moved. Seconded all in favor, say aye aye Item number 5 is approved. 00:15:32
I have #6 authorization to submit grant. 00:15:37
Final run application with ALDOT for the runway. 00:15:40
1230 crack seal and seal coat project total is $498,000, so we're asking permission to go ahead and apply for the final grant 00:15:43
applications once we get those bid numbers back. 00:15:48
So that ALDOT can award the grant to the city. So moved. 00:15:53
So. 00:16:00
We apply for this grant. 00:16:01
The half million we'd come up with 250. 00:16:06
That's correct. 00:16:08
And that's already in our. 00:16:09
Airport improvement funds already in the budget. 00:16:13
2nd. 00:16:16
Moved and seconded all in favor. Say aye, aye. 00:16:18
Opposed. 00:16:22
Motion carries. 00:16:23
Jeff, thank you for your leadership and what you're doing at the airport. 00:16:25
Thank you. 00:16:28
Is there any other business to be brought before our committee this afternoon? 00:16:31
Our next meeting? 00:16:36
Of our committee will be next Tuesday, August the 22nd of course at 2:30. 00:16:38
If there are no other items to be brought to us, I would entertain a motion to adjourn, so move second. 00:16:44
Moved and seconded all in favor, say aye. 00:16:50
We are adjourn. 00:16:54

Link

Start video at

Social

Embed


* you need to log in to manage your favorites

My Favorites List
You haven't added any favorites yet. Click the "Add Favorite" button on any media page, and they'll show up here.
* use Ctrl+F (Cmd+F on Mac) to search in document
Loading...
Unable to preview the file.
* use Ctrl+F (Cmd+F on Mac) to search in document
Loading...
Unable to preview the file.
Today is Tuesday. 00:00:00
August the 15th, our first order of business is approval. 00:00:01
Of the minutes when committee members have had a chance to review it, I would entertain a motion to approve. 00:00:05
Motion. 00:00:11
Second moved and seconded. Any discussion all in favor? Say aye, aye? 00:00:12
Minutes. 00:00:17
Are approved new business. Item number one is approval. 00:00:18
Of balancing change order to the contract with St. Bond Construction. 00:00:22
For the ESD parking project. 00:00:26
Wow. It's a deductive total of 57,477 thirds second. 00:00:29
I mean my I really want you to come back more with this kind of news. This is so good because. 00:00:37
We've got so many paving opportunities in this city. Do we know, Mr. Gurney, that we need to be taken care of? 00:00:43
I'll wait. If we had the opportunity to do this more often too. Me too. I might. I might cry. Mike, it's great. It's great. News 00:00:48
Project turned out well, and as you can see, we were. 00:00:53
Well. 00:00:58
That's awesome. We appreciate you. Appreciate you. 00:01:00
Do I hear a motion? I think I got a motion and a motion. Motion. Second, all in favor, say aye. 00:01:03
No item number one is free. 00:01:08
Yeah. 00:01:12
Mr. Tyler, I will explain to you why you need to vote yes later. Now item number two is authorization to submit grant application 00:01:12
with the US Department of Transportation for project for a project. 00:01:18
Ohh God Project protect. 00:01:24
Planning grant to fund Cribbs Mill Creek drainage design No match. 00:01:26
Right. Well, Sir. 00:01:29
So. 00:01:31
What this is we did? 00:01:33
May remember we did a study. 00:01:34
All Prismo Creek number 1/2. 00:01:36
Which are basically the tributaries, if you think 15th Street by Cookout. 00:01:39
That's where there's. 00:01:44
Like to buy just upstream of there behind behind DCH and all that it does reach near the railroad tracks and all that that we did, 00:01:46
we do this funding we funded. 00:01:51
Looking at it right, the study with you guys study. 00:01:59
Identified a solution and that solution is. 00:02:02
$33 million. 00:02:06
So obviously that's something that's gonna need outside assistance with this app, what this request is? 00:02:08
Request for authorization to apply for Protect grant. 00:02:15
To do the engineering will be the next step. 00:02:18
And. 00:02:21
That's significant and so that's $1.2 million. 00:02:22
They're about. 00:02:25
Home. 00:02:27
No match. It would set us up to be in position. 00:02:28
Then you're after. 00:02:32
The same type of grant funding for. 00:02:34
Questions So so this is also the one that hits. 00:02:38
What I call Parkview, but it may have a. 00:02:42
15th St. and 10th Ave. 00:02:46
That's not the same basis. 00:02:49
Parkview Basin. 00:02:54
Runs out, so the Parkview is really at the top of the base. 00:02:56
There's some, there's some more stuff on the north side of the railroad tracks. 00:03:01
But it goes. 00:03:05
Actually through close system across central athletic fields and Forest Lake. 00:03:08
Yeah, they're they're a little bit of force, like and then, you know, the truth is the little. 00:03:14
A channel where you're Hard Road and 2nd Ave. 00:03:18
Ohh down there that's that's kind of where that. 00:03:22
Eventually gets free flow. OK, so in a in a partnership like. 00:03:26
It's just with the university who who takes a lead. 00:03:31
But we're the. We're. We have to be the. 00:03:35
The sponsor of the local municipal. 00:03:39
OK. What's the, what's the time frame, Brian, I mean if we. 00:03:44
Well, we know. 00:03:49
If we if we're awarded. 00:03:50
I'm unsure of when will those. 00:03:53
If we're awarded. 00:03:56
Expected 90 days under the obligation dates. They requirement is in two years, September. 00:03:58
Of 25 it's gonna be completed, so I would expect. 00:04:03
You know by the end of the. 00:04:07
I said 90 days. 00:04:09
Do we know how competitive this particular grant? 00:04:11
Is. 00:04:14
I think it's. 00:04:16
Highly. 00:04:17
Sitting in meetings, talking about. 00:04:21
Right. Better do this for us. 00:04:24
I'm sorry Ron. So the about the obligation date is not the completion of the study date. The obligation date is just that we are 00:04:28
under contract and that we are we have obligated the funds through that so. 00:04:35
That dot has reviewed the contract and has approved that we can spend their money on the contract. That's all the obligations they 00:04:42
need. 00:04:46
Um. 00:04:49
Does it protect us? This is the first year they've done it and so it's a brand new. 00:04:50
Opportunity for the city of Tuscaloosa to be able to apply for it. It's just it's been made specifically for. 00:04:55
Basically our. 00:05:01
Needs exactly for this style of a of a project to apply. There are two separate types of applications that you can have through 00:05:02
protect. One is a planning grant and one of the actual construction grant. If we fulfill the planning side of things, we might be 00:05:07
in a better city. 00:05:12
Scenario here to apply for the construction grant the next time around. 00:05:18
This is a significant project, probably about, what, $15 million? 00:05:23
Approximately 12. 00:05:27
Construction and thought you said 33 so. 00:05:28
When we were doing it for build a couple of years ago, but so that was. 00:05:33
You know, we wouldn't be able to really fund this on our own without. 00:05:37
Possible federal help and so we're trying to get in the best possible scenario to be able. 00:05:41
To do that. 00:05:45
Is is is this internal Gray matter? Doing this Gray matter is doing the full application in conjunction with the University of 00:05:47
Alabama and algod. 00:05:52
Let's go ahead. 00:05:58
Some of the the parameters, I guess they're they're the criteria they're. 00:06:00
They're looking at is. 00:06:04
Of supply chains, you know they want resilient supply chains and so if we think this is. 00:06:06
Good qualifier for that with the railroad track. 00:06:11
The highway. 00:06:14
Nice. 00:06:16
That's good. That's something that. 00:06:17
I'm good with it. Yeah. Motion moved, seconded. All in favor, say aye, opposed. Item number two is approved. Thank you, Brian. 00:06:20
#3 is authorization for adoption of airport rent abatement and hanger development policy. Welcome, Jeff. 00:06:30
Good afternoon. 00:06:37
These first two items are associated. We've had various council members ask us to look into a potential incentive policy. We've 00:06:39
had the Airport Advisory Committee ask us to to do the same. When we looked at various concepts to try to figure out how can we 00:06:45
address the 100% capacity that we have in the airport, we've had it. 00:06:52
I know at least for the past 10-15 years, if not longer, and trying to find ways to encourage development that promotes more 00:06:59
capacity. 00:07:02
At the airport we've had some developments across the the airfield, but this one specifically is trying to promote development of 00:07:06
multiple aircraft. 00:07:10
In one development, sometimes they're called shade ports. T hangers, community hangers are all different layouts. 00:07:13
The basic premise is that there they can hold multiple aircraft for multiple people and that helps us grow the airport. 00:07:20
And we looked at grant type programs. 00:07:27
We've looked at funding it purely from a City side, We've looked at or try to work with parties that have done it with 100% 00:07:30
private. 00:07:33
Funding. 00:07:37
So our recommendation is looking at kind of a public private partnership. 00:07:38
Into where we look at simply a rent abatement up to five years and seeing if we can help offset those initial construction costs, 00:07:42
give them the ability to get a return on their investment. 00:07:47
And see what this policy has the the recommendation is limited only for 12 months and then we come back and just review it. 00:07:51
And seeing if it's up to update our asset, right, absolutely. I mean that's important. 00:07:58
What? 00:08:05
When we say the airport. 00:08:06
Is that 100%? 00:08:08
Occupancy for over 10 years. 00:08:10
That that does not include the two FBO's. 00:08:13
It does it all. The hangers that they have, the hangers that we lease, the private hangers on the airport, everyone is really, so 00:08:17
our spaces and their spaces are all book. 00:08:22
Absolutely. 00:08:27
You know. 00:08:30
Jeff, I I know you and I've had several conversations about this, but. 00:08:31
I'm very appreciative. 00:08:37
Of of the willingness to step out and look inside, This is kind of a different way of doing things right because I think the more. 00:08:40
These public private partnerships, I think really, really, really work well if if we structure in the right way. 00:08:47
And and we incentivize somebody to do this and then it's upgrading our asset, right. And absolutely and it keeps the city from 00:08:53
probably having to spend. 00:08:57
Millions of dollars. 00:09:02
And hopefully my car airport better and we can get the terminal fix. We're going to be in a great. 00:09:04
Either a new terminal or whatever we're going to do, right? That's that's. 00:09:09
I think that's. 00:09:12
Big Data one. Kudos. 00:09:13
To you and. 00:09:15
The Airport Advisory Committee, I'm assuming they're behind this? Yes Sir. Correct. And vetted this. 00:09:16
How many How many 100 spaces do we have? 00:09:21
We have over about 106 aircraft and so. 00:09:25
Comes down around 25 to 28 hangers. 00:09:28
What do you think are expected to handle? 00:09:32
Number would be. 00:09:34
Our new number, yes. 00:09:36
This will grow six additional spaces. 00:09:37
For the airport. 00:09:40
This one or the development that's coming in behind this recommendation, we have a lease that wants to take advantage of this now. 00:09:42
So their proposal to add six more spots and we're going to put this on our our airports website. 00:09:49
To let everybody know that people can take advantage of this. 00:09:54
It can be people that are currently on the airport can. 00:09:56
Take advantage of this, and any new tenants can take advantage. Do you have two? Councilman Wilson's point if you're going to 00:10:00
start, if we approve that item with six? 00:10:04
Do you have an estimated number that? 00:10:08
You think this might? 00:10:11
Could generate? I mean, what's your expectation of what? 00:10:13
This policy we would like. 00:10:15
We would like to see getting closer between 130 and 150 spots on the airport, so we have one. 00:10:18
Interested party now? 00:10:24
I think as we get it more out there in the public that it's available, we'll probably see some from additional interested parties. 00:10:25
How much room do you have or have? 00:10:33
Can you tell? 00:10:36
I mean, if you just want Christ. 00:10:38
We've probably got. 00:10:41
200 acres of developable land that's not being used currently. 00:10:42
But it wouldn't. It wouldn't hurt the future for plane landing or. 00:10:46
No, Sir. It's part of our master plan shows us where we have ample locations. So depending on the size and top of the velopment, 00:10:50
we kind of know where to put it on the airports or kind of efficiently locating everything. 00:10:55
So we've probably easily got 50 plus acres for this small size of the developer. 00:11:01
Jeff, will you go back and repeat something that you said that? 00:11:06
Anybody can apply to do this? 00:11:11
There's not one firm that's going to do this. 00:11:13
This is open to people that are leasing space from us right now. 00:11:16
And other people that would like to lease space that have been. 00:11:20
Turned down because they're. 00:11:24
All the space is being used because I know some people will say thanks to me that some people have hangers. 00:11:26
And they're not even using. 00:11:31
They don't have a plane in them. 00:11:32
But but this will allow. 00:11:34
Ultimately, more funds for the city. 00:11:37
And for development of our airport, correct it will. So I think that's important for the public to know. 00:11:39
And and there's not one person that's doing it, it's. 00:11:46
Multiple people. Is this coordinated with our FBS? 00:11:49
It's coordinated with the advisory committee. So our FBO's are a tenant just locked our private, that's what I'm asking, but 00:11:52
they're a tenant who also. 00:11:56
Creates and leases spaces, right. That's correct. Within there are lease parcel that they have. 00:12:00
So what I'm trying to get at is. 00:12:07
Is. 00:12:10
We're not stepping. 00:12:11
We're not stepping. 00:12:13
On our. 00:12:15
Our contracts with them. 00:12:16
Yes, we we are not, we are not we're not impeding and they are eligible to apply for this abatement as well. We're not like. 00:12:19
The franchise or licensing? 00:12:28
A Starbucks here. 00:12:30
And then? 00:12:33
On the block on either side, a year later, that's what I'm trying to get at. So an example, if they've got 10 acres within their 00:12:34
lease property that they haven't developed yet. 00:12:39
They can take five of those acres and apply it to this policy and get renovate milk. 00:12:44
For that acre within there. 00:12:49
There at least area that's good. 00:12:51
I'm good, so moved second. 00:12:53
Any other discussion all in favor, say aye. 00:12:55
The item is approved. That's item number one. 00:13:00
3. 00:13:03
Item number four is authorization for the Mayor to execute a hanger lease agreement with Tailwind and Blue Sky. 00:13:04
Aviation LLC. Jeff this is our our first interested party to take advantage of the rent abatement policy. They are interested in 00:13:10
building AT Hangar consisting OF6 aircraft. 00:13:17
They're to locate centrally on the airport just northwest of the main terminal. 00:13:23
Where the TPD hanger is, that's where they would like to locate and like to take advantage of a five year rent. 00:13:29
So. 00:13:36
They're gonna build a new hire. 00:13:37
That's correct. 00:13:39
The way that I had a, where are they from? 00:13:41
Their local Mr. Phillip Connard and Matt Mattis. 00:13:43
Macau. 00:13:48
Caddis with civil works construction. 00:13:49
Ohh, I'm glad that. 00:13:52
Yes, Sir. So they're they're basically gonna build the hangar. They're gonna give him an abatement like on for five years to help 00:13:54
them also. 00:13:57
And build new. 00:14:01
Build brand new on our. 00:14:02
On our property, so move. 00:14:04
That's good. 00:14:08
2nd. 00:14:10
Moved and seconded. All in favor, say aye aye. Item number four is approved. Item number 5 is approval. 00:14:11
Of work authorization with Atkins North America to provide design and bid phase services for runway 1230 crack seal coat. 00:14:18
Project $498,000, Jeff. 00:14:25
So the next two are associated. This is our first step in getting Atkins to provide the bid and design phases. 00:14:29
For a 5050 grant, that's alpha only. Typically we do an FANL dot grant. This is a aldot only for. 00:14:37
Pavement maintenance we are. 00:14:44
Needing to provide a seal coat and crack repair on the short runway. 00:14:46
Something of note with that particular piece of infrastructure is not FAA eligible. 00:14:51
So we are, we are very fortunate that ALDOT was willing to fund 50% of this. 00:14:56
Pavement maintenance. 00:15:01
And the number actually should be updated to 99,791. 00:15:02
And $0.31. 00:15:07
It is. 00:15:09
Once they are gone through the design and bid phase, they'll come back and apply that number and that will allow our dot to award 00:15:13
the grant to the City of Tuscaloosa. 00:15:17
This, says construction phase services also include all three. 00:15:24
Someone. 00:15:30
Moved. Seconded all in favor, say aye aye Item number 5 is approved. 00:15:32
I have #6 authorization to submit grant. 00:15:37
Final run application with ALDOT for the runway. 00:15:40
1230 crack seal and seal coat project total is $498,000, so we're asking permission to go ahead and apply for the final grant 00:15:43
applications once we get those bid numbers back. 00:15:48
So that ALDOT can award the grant to the city. So moved. 00:15:53
So. 00:16:00
We apply for this grant. 00:16:01
The half million we'd come up with 250. 00:16:06
That's correct. 00:16:08
And that's already in our. 00:16:09
Airport improvement funds already in the budget. 00:16:13
2nd. 00:16:16
Moved and seconded all in favor. Say aye, aye. 00:16:18
Opposed. 00:16:22
Motion carries. 00:16:23
Jeff, thank you for your leadership and what you're doing at the airport. 00:16:25
Thank you. 00:16:28
Is there any other business to be brought before our committee this afternoon? 00:16:31
Our next meeting? 00:16:36
Of our committee will be next Tuesday, August the 22nd of course at 2:30. 00:16:38
If there are no other items to be brought to us, I would entertain a motion to adjourn, so move second. 00:16:44
Moved and seconded all in favor, say aye. 00:16:50
We are adjourn. 00:16:54